Ver. 1.1
(58) Remove the Protective Paper, and Shipping
materials.
<Installing the Complete Fuser Unit>
See the installation steps in this section.
Note:
When reinstalling the Complete Fuser Unit, reset
the PM Counter.
Perform "F8-26" Fuser Belt Counter Reset, and
"F8-27" Fuser Main Counter Reset. (F7-02-65/85/
86 Fuser Belt Remain Count, and F7-02-66/87/88
Fuser Main Remain Count are also initialized by
this operation)
93
DP-C405/C305/C265
FEB 2008