hit counter script

Huawei iSiteC BTS3601C Installation Manual page 60

Cdma base station
Hide thumbs Also See for iSiteC BTS3601C:
Table of Contents

Advertisement

Installation Manual
iSiteC BTS3601C CDMA Base Station
All the cables should be secure. Do not over-strain the cables running round the
l
corner. Cables and fibers should run in straight and smooth courses without any
cross. Cables and fibers in the same direction should be bundled up. The cable
layout should be neat and tidy with the same bundling space.
There should be no damage to the shell of all the cables. 
l
II. Environment condition check 
1)
There should be no sundries inside or on top of the sun-shading cover. The cover
should be clean without any smudge or fingerprint. 
2)
There should be no redundant tape or cable tie on the cable. 
3)
There should be no tape, cable tie head, waste paper, or packing bag around the
IAFB. 
4)
All the things around the BTS should be clean and neat in their original
appearance. 
III. Power-on check 
Open the door of the IAFB and check whether the voltage of the power supply is normal.
If ther power switch is turned on normally, test with the multimeter whether the output
voltage is normal. 
A-7
Hardware Installation
A Installing IAFB

Advertisement

Table of Contents
loading

Table of Contents