hit counter script

Installation Check - Huawei iSiteC BTS3601C Installation Manual

Cdma base station
Hide thumbs Also See for iSiteC BTS3601C:
Table of Contents

Advertisement

Installation Manual
iSiteC BTS3601C CDMA Base Station
(1) Pole 
Figure A-7 Fixing fastener 
2)
Fix the IAFB to the fastener with M8%25 bolt. Its installation procedure is similar to
that on metal mast. See Figure A-6. 
A.5 Installation Check 
After all the parts are installed, check the installation in the following aspects: parts
installation overal check, BTS power-on check and environment check. 
I. Overall Check 
As a review on the whole foregoing installation process, the overall check includes the
following items:
1)
Fixation check 
The IAFB installed should satisfy the following requirements: 
The IAFB should be secure with neat appearance.
l
All the bolts and nuts are fastened with plain washer and spring washer mounted
l
in correct sequence. 
There should be no missing or damaged parts, and all the cables should be intact.  
l
The IAFB should be clean without any smudge, fingerprint or dust. 
l
2)
Cable connection check 
Power cables should be well connected. The plugs should not be loose or
l
damaged. And there should be no scratch or fissure on the power cable shell. 
Check whether the contact of the grounding cables is good. 
l
 
(2) Fastener 
(3) Plain washer, spring washer, nut 
 
A-6
Hardware Installation
A Installing IAFB
(4) M12 bolt 

Advertisement

Table of Contents
loading

Table of Contents