Installation Manual
iSiteC BTS3601C CDMA Base Station
3)
Attach the corresponding labels to both ends of the feeder after cutting a piece.
3.7.2 Hoisting Feeder
1)
Wrap the feeder end in a piece of gunny cloth (or antistatic bag) after the
corresponding connector is completed. Bind the cloth up using a rope or a binding
tape;
2)
Knot the lifting rope at the point about 0.4m away from the feeder end and tie
another knot at the point about 4.4m away from the feeder end to prepare for
feeder hoisting, as shown in Figure 3-34.
(1)
(2)
(1) Lifting rope
Figure 3-34 Protection of feeder connector
3)
Hoist the feeder to the tower platform. No violent hoisting is allowed so as to avoid
damage to the feeder skin due to possible collision with the building or the tower.
In the meantime, take care of your safety.
4)
Fix the upper end of the feeder in a proper position by multiple-point fastening lest
that the feeder fall from the tower. However, it should not be too close to the
antenna, as shown in Figure 3-35. Select 1-for-1 fixing clip or 1-for-3 fixing clip as
is required, as shown in Figure 3-36.
3 Installing RF Antenna and Feeder System
(2) Feeder
3-26
Hardware Installation