hit counter script
Download Print this page
Panasonic EB-X70 Technical Information
Panasonic EB-X70 Technical Information

Panasonic EB-X70 Technical Information

Digital cellular phone
Hide thumbs Also See for EB-X70:

Advertisement

Quick Links

Subject : Baseband Calibration Procedure
1 Introduction
Please replace Pages 55 and 56 of the X70 Service Manual with the new pages attached to this Technical Bulletin.
This service information is designed for experienced repair technicians only and is not designed for use by the general
public. It does not contain warnings or cautions to advise non-technical individuals of potential dangers in attempting to
service a product. Products powered by electricity should be serviced or repaired only by experienced professional
technicians. Any attempt to service or repair the product or products dealt with in this service information by anyone else
could result in serious injury or death.
WARNING
Order Number: PMCD031201T8
Digital Cellular Phone
EB-X70
© 2003 Matsushita Mobile Communications
Development of Europe Ltd. All Rights Reserved.
Unauthorised copying and distribution is a
violation of law.

Advertisement

loading

Summary of Contents for Panasonic EB-X70

  • Page 1 Order Number: PMCD031201T8 Digital Cellular Phone EB-X70 Subject : Baseband Calibration Procedure 1 Introduction Please replace Pages 55 and 56 of the X70 Service Manual with the new pages attached to this Technical Bulletin. WARNING This service information is designed for experienced repair technicians only and is not designed for use by the general public.
  • Page 3: Battery Calibration

    CALIBRATION PROCEDURES 9.4. Battery Calibration 9.4.1 Preliminaries Connect the RF Adaptor / Baseband Jig, telephone and PC as shown in the diagram below. +3.7V POWER SUPPLY CABLE 1 PCB REPAIR JIG +5.8 V POWER SUPPLY CABLE 2 10766-1 Figure 9.3: Battery calibration test connections With the CB2000 software running, select the ‘Baseband Calibration’...
  • Page 4 CALIBRATION PROCEDURES 9.4.4 Charging Calibration Switch on PSU2 and set the voltage to 5.8 V. Connect Cable 2 to the connector of Cable 1. Carry out the instructions described in the main dialogue window. When prompted, measure the RF Adaptor / Baseband Jig voltage by connecting a voltmeter to the terminals on the RF Adaptor / Baseband Jig.