10.1 SETTING EXAMPLE
10 APPLICATION OF SETTINGS
10.1.14 FREQUENCY
The pickup and delay settings are dependent on operating practices and system characteristics. In this example, two over-
frequency and two underfrequency elements will be used. The elements will be blocked when offline. Underfrequency will
initiate a trip. Overfrequency will alarm only. Either source may be assigned.
Make the following changes in EnerVista UR Setup or through the
SETTINGS
CONTROL ELEMENTS
UNDERFRE-
and the
QUENCY
UNDERFREQUENCY 1(2)
SETTINGS
CONTROL ELEMENTS
OVERFREQUENCY
OVERFREQUENCY
menus:
1(2)
10.1.15 ACCIDENTAL ENERGIZATION
In this example, the
is selected as "UV and Offline". The
setting
ACCDNT ENRG ARMING MODE
ACCDNT ENRG OC PICKUP
should be set at ½ the minimum expected fault current. In this case, 1.0 pu (8000 A primary) is selected. In cases where it
is possible to re-energize the machine through its auxiliary transformer, a lower setting may be required. The undervoltage
pickup setting must be set above the maximum expected fault voltage.
Make the following changes in EnerVista UR Setup or through the
SETTINGS
GROUPED ELEMENTS
SETTING GROUP
menu:
1
ACCIDENTAL ENERGIZATION
10
10-12