Cable Installation Checklist
Table 4-2
Table 4-2 Cable installation checklist
No.
1
Issue 02 (2012-09-10)
Item
The card is installed and removed
easily. The screws on the panel should
be appropriately tightened and easily
disassembled. The spring wire is intact.
The cabinet surface must be tidy and
clean; the components of the cabinet
cannot be distorted; all identifiers are
correct, clear, and complete.
The cabinet is kept clean and there are
no excessive binding straps and other
articles in the cabinet.
The ESD wrist straps are connected the
ESD jack in the chassis.
Blank panels are installed in all empty
slots.
describes the cable installation checklist.
Item
The power cables and ground cables must
be the copper wires and have no splice.
The cables are safely connected
complying with standards.