4.1 Checking Before Power-on

After hardware installation is complete, you need to check the device installation and cable
installation.
Device Installation Checklist
Before power-on, all the power distribution cabinets and power distribution frames must be off.
Table 4-1
Table 4-1 Device installation checklist
No.
1
2
Issue 02 (2012-09-10)
NOTE
Before power-on, you need to check the device cabinet, cables, connectors, sockets, labels, and on-site
environment.
CAUTION
describes the device installation checklist.
Item
The cabinet is installed according to the
dimensions on the design paper.
The expansion bolts for fixing the
cabinet or base (support) to the ground
are fastened. The plain washer, spring
washer, and nut (bolt) are installed
correctly.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
4 Powering on the Device
Method
Check the cabinet according to the
project design document.
-
49