hit counter script

Installing The Outdoor Unit - Huawei NetCol5000-A050 User Manual

In-row air cooled smart cooling product
Hide thumbs Also See for NetCol5000-A050:
Table of Contents

Advertisement

NetCol5000-A050 In-row Air Cooled Smart Cooling
Product
User Manual
Figure 4-36 Placing a top frame
Step 4 Secure the top frame.
1.
2.
3.
Figure 4-37 Securing the top frame
----End

4.5 Installing the Outdoor Unit

Issue 08 (2021-09-17)
Use the four M5x10 tapping screws and the six M4x10 countersunk screws to
secure the rear plate to the top frame, and clamp the rear plate, as shown by
(1) and (2) in
Figure
Use the four M8x20 screw assemblies to secure the top frame to the cabinet,
as shown by (3) and (4) in
Install two M5x10 tapping screws at the front of the top frame to set up
equipotential bonding between the cabinet and the top frame, as shown by
(5) in
Figure
4-37.
Copyright © Huawei Technologies Co., Ltd.
4-37.
Figure
4-37.
4 Installation
67

Advertisement

Table of Contents
loading

Table of Contents