(15kV - 25kV) at its starts. Since the lamp is very high temperature during units operation replacement of the lamp should be done at least 45 minutes after the power has been turned off, to allow the lamp cool-off. PDG-DWL100 Confidential...
5. Tweezers 6. Projector * Before you start: This process is protective level II. Operators should wear electrostatic chains. * Note: - If you need to replace the main board, you have to record the lamp usage hour. PDG-DWL100 Confidential...
3. Disassembled the left filter and the right filter. The left filter The right filter 2-3 Disassemble Lamp Cover Module 1. Loosen 2 screws (as red circle) on the Lamp Cover. 2. Disassembled the Lamp Cover Module. PDG-DWL100 Confidential...
1. Loosen 2 screws (as red circle) on the Lamp Module. 2. Pull out the Lamp Module. 2-5 Disassemble Top Cover Module, Front Cover and Lens Cover 1. Unscrew 4 screws (as red circle) from the Bottom Cover. PDG-DWL100 Confidential...
Page 12
(as picture A shown). - Make sure the FPC cable plug into the correct ports when assembling it. 3. Disassembled the Lens Cover, Front Cover and Top Cover Module. PDG-DWL100 Confidential...
2. Separate mylar, keypad board and keypad. 3. Tear off 2 EMI gaskets (as green square). Keypad 2-7 Disassemble Zoom Ring Module 1. Unscrew 3 screws (as red circle) from the Top Cover Module. 2. Remove the Zoom Ring Module. Zoom Ring Module PDG-DWL100 Confidential...
4. Unplug 1 connector (as green square) to disassemble the FPC cable. Top Shielding FPC Cable 2-9 Disassemble Main Board Module 1. Unscrew 2 screws (as blue circle). 2. Unscrew 6 hex screws (as green circle). 3. Unscrew 2 screws (as red circle). PDG-DWL100 Confidential...
Page 15
Wire and Black wire tube (3 pin) Compose of Red/White/Black Blower Wire and Blue wire tube (3 pin) Compose of Red/Black/Yellow Wire (3 pin) Compose of Red/Black Wire and Speaker Black wire tube (2 pin) Lamp Driver Black wire tube (5 pin) PDG-DWL100 Confidential...
5. Unplug 1 connector (as orange square) . Disassembled the Main Board Module. 2-10 Disassemble Lan Board Module 1. Unscrew 1 screw (as green circle) to disassemble the Lan Board Module. PDG-DWL100 Confidential...
(as red square). 3. Tear off two black rubbers (as green square). 2-11 Disassemble Main Board Shielding 1. Unscrew 3 screws (as red circle) to disassemble the main board shielding. 2. Disassembled the Main Board Shielding. PDG-DWL100 Confidential...
2. Tear off the black mylar (as yellow square). 3. Separate the speaker rubber and speaker. 2-13 Disassemble Engine Module 1. Unscrew 6 screws (as red circle) to disassemble the Engine Module. 2. Remove the Engine Module. PDG-DWL100 Confidential 2-10...
- Found that the DMD Chip has scrapes or dirt use of a magnifying glass, you may use an electrostatic ion gun to clean it. - Pay attention to the fixed position when assembling the DMD Chip. PDG-DWL100 Confidential 2-11...
3. Unplug 1 connector (as yellow square). 4. Unplug 2 connectors (as blue square) to take off the LVPS Module and the AC Inlet Bracket. 5. Unplug 1 connector (as red square). 6. Disassembled the LVPS. AC Inlet Bracket LVPS PDG-DWL100 Confidential 2-12...
Thermal Switch. 2. Disassembled the Thermal Switch. 2-19 Disassemble Fan Module 1. Unscrew 4 screws (as red circle) to disassemble the Fan Module. 2. Unscrew 4 screws (as blue circle) to separate the Fan and Fan Shielding. PDG-DWL100 Confidential 2-1...
Note: - Take the Fan Module as the right gesture. Fan Shielding The right gesture The wrong gesture 2-20 Disassemble Blower Module 1. Unscrew 3 screws (as red circle) to disassemble the Blower Module. 2. Seprate the Blower and Blower Rubber. PDG-DWL100 Confidential 2-1...
Note: - To avoid over adjusting the rod. - After the opreation, please use the glue to fix the screws. - Please use Z type driver to adjust Rod screw 1. PDG-DWL100 Confidential 2-1...
Power off (Cooling-II: It can Flashing accept power key to turn on the projector) Error (Lamp failed) Error Flashing (Fan lock) Error (Over temp.) Steady light When LED light on after 5 sec., go to standby mode. No light PDG-DWL100 Confidential...
Over Temp.: Power LED (lights red), Temp LED (lights red) Auto Shut Down - Clean air filters - Check Fan - Check Thermal Switch - Check Main Board c. Fan Lock: Power LED (lights red), Temp LED (Flashes red) - Check Fan - Check Main Board PDG-DWL100 Confidential...
Page 29
- Check Color Wheel Mechanical Noise - Check Fan Module - Check if the Main Board and the DMD Board are assembled properly - Check Main Board Line Bar/Line Defect - Check DMD Board - Check DMD Chip PDG-DWL100 Confidential...
Page 30
- Clean DMD Chip and Engine Module (Out of spec.) - Check DMD Chip - Check Engine Module - Ensure that the signal cables and source work as well - Check Main Board Garbage Image - Check DMD Board PDG-DWL100 Confidential...
Page 31
(2) Get into service mode (please refer to 4-2 for details) Forget Password (3) Select “factory reset”. click “enter” button. (4) The “security settings” in OSD menu will change to “OFF” and user can use the default password (1234) to set new password . PDG-DWL100 Confidential...
(1) Please get into OSD menu. (2) Execute “Factory Default” function under “Setting”. 2. Lan Card Reset (1) Get into Service mode. (2) Select “Lan Card Reset”, click “Enter” to restore all lan card setup to its factory default settings. PDG-DWL100 Confidential...
Press right key to adjust the time (50) Lamp Off Press right key to adjust the time (10) Set burn in cycle Press right key to adjust the cycle After setting up the time, choose “Get into Burn-In Mode” and press enter PDG-DWL100 Confidential...
(2) Select “Tracking” function and use right or left arrow key to adjust the value to minimize video flicker. - Adjust Resync or Frequency/Tracking/H. Position/V. Position to the inner screen. Master Inspection item - Eliminate visual wavy noise by Resync, Frequency or Tracking selection. PDG-DWL100 Confidential...
Page 38
- The dark pixel is unacceptable in Zone A under full white pattern; other area can accept no more than 6 dark pixels. - Adjacent pixels are unacceptable. - Ref. Defect specification table Full white Note: The defect criteria follows TI specification. PDG-DWL100 Confidential...
Page 39
(Blur word on one of the corner after adjustment is acceptable. However, the word should at least be recognizable.) 7. Color Performance Procedure - Test equipment: video generator. - Test signal: 1280 x 800@75Hz, 1080P PDG-DWL100 Confidential...
1. CV�S Procedure - Test equipment: DVD player - Test signal: CVBS Inspection item - Video performance test Inspection Distance - 0.5M ~1.0M Criteria - Check any abnormal color, line distortion or any noise on the screen. Motion video PDG-DWL100 Confidential...
Page 41
- Plug Audio cable into Audio Out port, check whether the outboard speaker’s “Volume” is normal. - Adjust the volume to “0→ 9” by using the remote controller. - Check the sound from speaker. - Check whether the “mute” is normal. PDG-DWL100 Confidential...
- If there is noise on the screen, the product is considered as failure product. - The screen appears normal, it shouldn’t appear any abnormal condition, such as lines and so on. - Check if the projection is same as monitor diplayed. PDG-DWL100 Confidential...
- Follow Contrast formula to calculate contrast values. ☼ Contrast Formula Full black pattern P5/B5 Note: P5 = Lux of center in full white pattern B5 = Lux of center in full black pattern PDG-DWL100 Confidential 4-10...
Page 45
- Key in the IP address: 192.168.0.100. - Key in the Subnet mask: 255.255.255.0. (5) The image C will appear on the screen, please wait a moment. (6) The image D will appear on the screen, please wait a moment. PDG-DWL100 Confidential 4-12...
Page 46
(3) Modify the IP address to 192.168.0.99, and modify Subnet mask to 255.255.255.0. Note: - The HOST ID (192.168.0.XXX) of PC IP address must be different from the projector IP address written down in step 1 of 4-11-1. (4) Click “OK”. PDG-DWL100 Confidential 4-13...
Factory Default - The factory settings (with appropriate centering, size, geometry distortion, etc.) shall be displayed upon “Recall” is selected from OSD. PDG-DWL100 Confidential 4-14...
Page 48
It should be locked in the correct place. Plastic Parts All plastic parts can not be broken and damaged. Safety or warning All safety and warning labels should be visible, label including all contents. All interface connectors should be complete and Connector workable. PDG-DWL100 Confidential 4-15...
- Library file (library file has to put in PC and set right path in 5-1-3 step 4) Hardware: - Projector - Power cord: CH4200105G011 (US Type) CH4200120G011 (EU Type) CH4200110G011 (UK Type) - RS232 cable (DSUB(F) 9 – DIN(M) 8) - PC or Laptop PDG-DWL100 Confidential...
1. Choose "DLP Composer Lite V8.3 Setup" Program. 2. Click "Next". 3. Read "License Agreement". - Choose "I accept and agree to be bound by all the terms and conditions of this License Agreement". - Click "Next". 4. Click "Next". PDG-DWL100 Confidential...
Page 51
"Browse" button to change the Browse" button to change the " button to change the button to change the downloading location to “program files”, then click "Next". click "Next". 6. Click "Next". 7. The program is executing "installing" status. 8. Click "Finish". PDG-DWL100 Confidential...
- Loosen the two buttons. Menu button - Connect projector with PC by RS232 cable. Note: The system fan and the lamp will not operated. RS232 port 2. Execute the "DLP Composer Lite 8.3" file. Power port 3. Click "Edit" and "Perferences". PDG-DWL100 Confidential...
Page 53
(3) In "Stop Bits" item, select "1". (4) In "Parity" item, select "None". (5) In "RTS" item, select "Enable". (6) In "CTS" item, select "Disable". (7) Key in "6000" into "Read" and "Write" items of "Timeouts (in milliseconds)". - Click "OK". 7. Click "OK". PDG-DWL100 Confidential...
Page 54
9. Select "Complete Image Download", then select "Skip Boot Loader Area". (select "32KB"). - Click "Reset Bus" to erase the flash memory. 10. If the FW is ready, click "Start Download" to execute the firmware upgrade. - Click "Yes". 11. Proceeding Picture. PDG-DWL100 Confidential...
Page 55
13. Check FW version. - Re-plug in power cable, then restart the unit and get into the Service mode to check the firmware version. (To get into Service mode, please press "Power", "Enter", "Enter" and "Menu" buttons sequentially.) PDG-DWL100 Confidential...
Page 58
- Select the additional task that you may create a desktop icon. 6. Click "Install" to begin installing NLINK Procedure. 7. Click "Finish". - Complete the NLINK setup. 8. "MCU Choose" picture will appear on the screen. - Close the picture. PDG-DWL100 Confidential 5-10...
(3) Click "Next". (4) Select "Include this location in the search", then click "Browse". (5) "Browse For Folder" picture will appear on the screen. (6) Select "TPRP1" folder in the "Manley USB Driver_N-Link" folder, then click "OK". PDG-DWL100 Confidential 5-11...
Page 60
(7) Click "Next". (8) Click "Continue Anyway". (9) Click "Browse". (10) Select the file "slabser.sys", then open (10) PDG-DWL100 Confidential 5-12...
Page 61
Note: - When we execute NLINK program, the Power LED flashes orange and Fixture LED flashes red. 2. Choose the right type of MCU - "MCU Choose" picture will appear on the screen, select "W79E804". - Click "OK". PDG-DWL100 Confidential 5-13...
Page 62
(as red square). 6. Check 8051 FW version - Turn on the unit and get into the service mode to check the 8051 FW version. (To get into Service mode, please press "Power", "Enter", "Enter" and "Menu" buttons sequentially.) PDG-DWL100 Confidential 5-14...
"IP address/tgi/fu.tgi". - Click "Continue". 4. "Firmware Update" image will appear on the screen. - Click "Browse" button to select the Network FW file (*.bin) which you saved. - Click "Open". 5. Click "Update" to start updating. PDG-DWL100 Confidential 5-1...
Page 65
6. Firmware Upgrade procedure. 7. Click "Re Login". 8. Firmware upgrade procedure completes. - The projector Network FW version will appear. PDG-DWL100 Confidential 5-1...
- After several seconds, the Temp LED and Lamp LED will light red, then loosen "Input" and "Enter" buttons. Enter button - After 5 seconds, the Temp LED and Lamp LED will flash red. - Waveform Download is completed. PDG-DWL100 Confidential 5-18...
Appendix A (Exploded Image) Note: This chapter is only designed to show the exploded image of the projector. For updated part numbers, please refer to RSPL report. D.C. PDG-DWL100 PDG-DWL100 Confidential...
Page 68
CH708EL07GR01 ASSY ENGNE MODULE PDG-DWL100(SERVCE) ASSY COLOR WHEEL MODULE PDG-DXL100/ PDG-DWL100 PDG-DWL100 CH708EM16GR01 (SERVCE) ASSY ENGNE MODULE WTH CW AND DMD PDG-DWL100 CH708EL09GR01 (SERVCE) CH438EM17G001 THERMAL SWITCH WITH BRACKET (KLIXON YS11) 105deg. C CH758EL02G001 BUY ASSY TOP COVER MODULE PDG-DWL100...
6 = Month (ex:6 = June) 01002 = Production number (5 digits), It starts from “01001” ~“99999” EX: 59601002 This label "59601002" represents the serial number for PDG-DWL100. It is produced on June of 2009. Its serial code is 01002. PDG-DWL100 Confidential...