hit counter script

Installation - GE PTAN9150MWW Technical Service Manual

Top load washer
Table of Contents

Advertisement

Installation

INSTALLATION REQUIREMENTS
DRAINAGE
A vertical standpipe with an internal diameter of 1-1/2"
Cable tie
(3.8 cm) is required. The standpipe height above the
floor must be:
Minimum height: 36" (91,4 cm)
Maximum height: 96" (243,8 cm)
Insert the drain hose into the standpipe and secure it
with the cable tie located inside the accessories bag.
The standpipe must be open to the atmosphere (there
must be an air gap around the drain hose).
If you need to extend the lenght of the drain hose to
reach
your standpipe, please contact your local parts store to
purchase the recommended drain hose extension for
your washer.
WATER SUPPLY REQUIREMENTS
Hot and cold water faucets MUST be installed within 42"(107 cm) of your washer's water inlet. The
faucets MUST be 3/4" (1.9 cm) garden hose-type so inlet hoses can be connected.
Water pressure MUST be between 10 and 100 pounds per square inch.
Your water department can advise you of your water pressure.
The hot water temperature should be set to deliver water at 120° to 140°F (48° to 60°C).

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ptan9250mwsPtan9350mwsPtan9450mwsPtan9455mgg

Table of Contents