Insert screws through the rack into the mounting rail and the front of each mounting bracket. Do not
3.
tighten.
Insert screws through the rack into the mounting rail and the rear of each mounting bracket. Do not
4.
tighten.
Tighten the wing nuts.
5.
Wait until the unit is installed and the brackets are adjusted before tightening the screws.
6.
WARNING: Uneven mechanical loading in the rack may cause a hazardous condition.
CAUTION: Always plan the rack installation so that the heaviest item is on the bottom of the rack. Install
the heaviest item first, and continue to populate the rack from the bottom to the top.
With one person on each side, lift the chassis to rail level and slide the chassis on the mounting rails.
7.
Attach the chassis to the rack using the supplied screws.
8.
Connecting the ERM to the UPS
Installation 33