Sign In
Upload
Download
Table of Contents
Contents
Add to my manuals
Delete from my manuals
Share
URL of this page:
HTML Link:
Bookmark this page
Add
Manual will be automatically added to "My Manuals"
Print this page
×
Bookmark added
×
Added to my manuals
Manuals
Brands
ABB Manuals
Camera Accessories
RT G2 5-10 kVA UL
User manual
ABB RT G2 5-10 kVA UL User Manual
External battery module
Hide thumbs
1
Table Of Contents
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
page
of
20
Go
/
20
Contents
Table of Contents
Bookmarks
Table of Contents
Table of Contents
Important Safety Instructions
Save These Instructions
Safety Symbols and Warnings
Important Safety Warnings
UPS Disposal and Recycling
For Professional Users in the European Union
For Disposal in Countries Outside of the European Union
Certification Standards
Introduction
Environmental Protection
Substances
Packing
General Characteristics
Rear Panel View
Installation
Inspecting the Equipment
Unpacking the Unit
Check the Inside Package
Installing the EBM
Install in the Rack Position
Install in the Tower Position
Connecting with UPS and Other Battery Pack
Battery Installation
Specification
EBM Configuration
Physical Parameter
Certifications
Environmental
Storage & Maintenance
Storage
Advertisement
Quick Links
Download this manual
—
U S E R M A N UA L
External battery module
For RT G2 5-10 kVA UL
PREPARED: Elvan Chen
APPROVED: Patricia Kuenzle
OWNING ORGANIZATION:
ABB Switzerland Ltd.
© Copyright 2022 ABB. All rights reserved.
STATUS
Approved
DOCUMENT KIND: Operating manual
DOCUMENT ID: 4NWD005661 REV: A
SECURITY LEVEL: Public
PAGE:
1 / 20
LANG: EN
Table of
Contents
Previous
Page
Next
Page
1
2
3
4
5
Advertisement
Table of Contents
Related Manuals for ABB RT G2 5-10 kVA UL
Camera Accessories ABB REACT2-BATT Quick Installation Manual
(2 pages)
Camera Accessories ABB 83327-500 Manual
Camera interface (17 pages)
Camera Accessories ABB Battery cabinet for PowerValue 11-31T 10-20 kVA User Manual
(12 pages)
Camera Accessories ABB PowerValue 11/31T User Manual
Battery cabinet (29 pages)
Camera Accessories ABB TA521 Installation Instructions
Lithium battery (2 pages)
Summary of Contents for ABB RT G2 5-10 kVA UL
Page 1
— U S E R M A N UA L External battery module For RT G2 5-10 kVA UL STATUS PREPARED: Elvan Chen Approved SECURITY LEVEL: Public APPROVED: Patricia Kuenzle DOCUMENT KIND: Operating manual OWNING ORGANIZATION: PAGE: 1 / 20 ABB Switzerland Ltd.
Page 2: Table Of Contents
Storage ..........19 STATUS: SECURITY LEVEL: DOCUMENT ID: REV: LANG: PAGE: 2 / 20 Approved Public 4NWD005661 © Copyright 2022 ABB. All rights reserved.
Page 3: Important Safety Instructions
BOOKLET BEFORE STARTING WORK OR BEFORE OPERATING EQUIPMENT OR MACHINERY IS COMPULSORY. DO NOT DISPOSE OF WITH ORDINARY TRASH. STATUS: SECURITY LEVEL: DOCUMENT ID: REV: LANG: PAGE: 3 / 20 Approved Public 4NWD005661 © Copyright 2022 ABB. All rights reserved.
Page 4: Important Safety Warnings
Servicing of Batteries Should be Performed or Supervised by Trained Personnel with Knowledge of Batteries and the Required Precautions NOTE STATUS: SECURITY LEVEL: DOCUMENT ID: REV: LANG: PAGE: 4 / 20 Approved Public 4NWD005661 © Copyright 2022 ABB. All rights reserved.
Page 5: Ups Disposal And Recycling
RESOURCES AND PREVENT ANY POTENTIAL NEGATIVE EFFECTS ON HUMAN HEALTH AND THE ENVIRONMENT, WHICH COULD OTHERWISE ARISE FROM INAPPROPRIATE WASTE HANDLING STATUS: SECURITY LEVEL: DOCUMENT ID: REV: LANG: PAGE: 5 / 20 Approved Public 4NWD005661 © Copyright 2022 ABB. All rights reserved.
Page 6: For Disposal In Countries Outside Of The European Union
IEC 61000-4-8 (Power Frequency Magnetic Field Immunity): level 4. • IEC 61000-2-2 (Low Frequency Signals) • IEC 61000-4-3 (RS): level 3 STATUS: SECURITY LEVEL: DOCUMENT ID: REV: LANG: PAGE: 6 / 20 Approved Public 4NWD005661 © Copyright 2022 ABB. All rights reserved.
Page 7: Introduction
HDPE Polyvinyl chloride Low-density polyethylene LDPE Polypropylene Polystyrene FOLLOW ALL LOCAL REGULATIONS FOR THE DISPOSAL OF PACKING MATERIALS NOTE STATUS: SECURITY LEVEL: DOCUMENT ID: REV: LANG: PAGE: 7 / 20 Approved Public 4NWD005661 © Copyright 2022 ABB. All rights reserved.
Page 8: General Characteristics
3 1 Rear Panel View — 3.1-1 Rear Panel View — 3.1-1 Item EBM Breaker Downstream EBM connector(output) Upstream EBM connector(input) STATUS: SECURITY LEVEL: DOCUMENT ID: REV: LANG: PAGE: 8 / 20 Approved Public 4NWD005661 © Copyright 2022 ABB. All rights reserved.
Page 9: Installation
PACKING MATERIALS MUST BE DISPOSED OF IN COMPLIANCE WITH ALL LOCAL REGULATIONS CONCERNING WASTE. RECYCLING SYMBOLS ARE PRINTED ON THE PACKING MATERIALS TO FACILITATE SORTING. STATUS: SECURITY LEVEL: DOCUMENT ID: REV: LANG: PAGE: 9 / 20 Approved Public 4NWD005661 © Copyright 2022 ABB. All rights reserved.
Page 10: Check The Inside Package
4. Do not place the unit in a dusty or corrosive environment or near any flammable objects. 5. This unit is not designed for outdoor use. STATUS: SECURITY LEVEL: DOCUMENT ID: REV: LANG: PAGE: 10 / 20 Approved Public 4NWD005661 © Copyright 2022 ABB. All rights reserved.
Page 11: Install In The Rack Position
Step 2: Place EMBS (optional), UPS, EBM, and ISO TX (optional) on tower feet assembly. Please refer to the below diagram. — 4.4.2-2 STATUS: SECURITY LEVEL: DOCUMENT ID: REV: LANG: PAGE: 11 / 20 Approved Public 4NWD005661 © Copyright 2022 ABB. All rights reserved.
Page 12: Connecting With Ups And Other Battery Pack
REMOVE THE BATTERY CONNECTOR COVER BEFORE CONNECTING WITH UPS AND OTHER BATTERY PACK. NOTE First battery pack Second battery pack — 4.4.3-1 STATUS: SECURITY LEVEL: DOCUMENT ID: REV: LANG: PAGE: 12 / 20 Approved Public 4NWD005661 © Copyright 2022 ABB. All rights reserved.
Page 13: Battery Installation
Step 1: Remove the topcover as below diagram. — Step 2: Remove the battery fixing plates from the bottom case as below diagram. — STATUS: SECURITY LEVEL: DOCUMENT ID: REV: LANG: PAGE: 13 / 20 Approved Public 4NWD005661 © Copyright 2022 ABB. All rights reserved.
Page 14
Step 3: Place the battery into the bottom case and then, assemble the battery fixing — plates with screws back on bottom case as below diagram. Step 3 — STATUS: SECURITY LEVEL: DOCUMENT ID: REV: LANG: PAGE: 14 / 20 Approved Public 4NWD005661 © Copyright 2022 ABB. All rights reserved.
Page 15
E X T E R N A L B AT T E R Y M O D U L E F O R R T G 2 5 - 1 0 K VA U L Step 4: Connect the battery wire as below diagram. — Step 4 — STATUS: SECURITY LEVEL: DOCUMENT ID: REV: LANG: PAGE: 15 / 20 Approved Public 4NWD005661 © Copyright 2022 ABB. All rights reserved.
Page 16
8 inches 1pcs AWG10 BLK 200mm 8 inches 1pcs AWG10 BLK 250mm 10 inches 1pcs AWG10 RED 530mm 21 inches STATUS: SECURITY LEVEL: DOCUMENT ID: REV: LANG: PAGE: 16 / 20 Approved Public 4NWD005661 © Copyright 2022 ABB. All rights reserved.
Page 17: Specification
FCC CFR 47 Part 15 Class A Safety UL 1778, CSA 107.3 Transportation IEC 60068-2-31 IEC 60068-2-64 IEC 60068-2-27 STATUS: SECURITY LEVEL: DOCUMENT ID: REV: LANG: PAGE: 17 / 20 Approved Public 4NWD005661 © Copyright 2022 ABB. All rights reserved.
Page 18: Environmental
Minimum Clearances from 25cm (1inch) for front and rear side other cabinet 0cm for left and right side IP grade IP20 STATUS: SECURITY LEVEL: DOCUMENT ID: REV: LANG: PAGE: 18 / 20 Approved Public 4NWD005661 © Copyright 2022 ABB. All rights reserved.
Page 19: Storage & Maintenance
Recharge Frequency Every 3 months (-15°C - 40°C/5°F – 104°F) Every 2 months (40°C - 45°C/104°F-113°F) Charging Duration 1-2 hours STATUS: SECURITY LEVEL: DOCUMENT ID: REV: LANG: PAGE: 19 / 20 Approved Public 4NWD005661 © Copyright 2022 ABB. All rights reserved.
Page 20
— ABB Switzerland Ltd. Via Luserte Sud 9 6572 Quartino Switzerland www.abb.com/ups © Copyright 2022 ABB. All rights reserved. Specifications subject to change without notice.
Table of Contents
Print
Rename the bookmark
Delete bookmark?
Delete from my manuals?
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL