hit counter script
Cisco Catalyst 2955 Hardware Installation Manual
Cisco Catalyst 2955 Hardware Installation Manual

Cisco Catalyst 2955 Hardware Installation Manual

Cisco systems switch installation guide
Hide thumbs Also See for Catalyst 2955:
Table of Contents

Advertisement

Catalyst 2955 Hardware Installation
Guide
November 2004
Corporate Headquarters
Cisco Systems, Inc.
170 West Tasman Drive
San Jose, CA 95134-1706
USA
http://www.cisco.com
Tel:
408 526-4000
800 553-NETS (6387)
Fax:
408 526-4100
Customer Order Number: DOC-7814944=
Text Part Number: 78-14944-03

Advertisement

Table of Contents
loading

Summary of Contents for Cisco Catalyst 2955

  • Page 1 Catalyst 2955 Hardware Installation Guide November 2004 Corporate Headquarters Cisco Systems, Inc. 170 West Tasman Drive San Jose, CA 95134-1706 http://www.cisco.com Tel: 408 526-4000 800 553-NETS (6387) Fax: 408 526-4100 Customer Order Number: DOC-7814944= Text Part Number: 78-14944-03...
  • Page 2 Modifications to this product not authorized by Cisco Systems, Inc. could void the FCC approval and negate your authority to operate the product. The Cisco implementation of TCP header compression is an adaptation of a program developed by the University of California, Berkeley (UCB) as part of UCB’s public domain version of the UNIX operating system.
  • Page 3 CCSP, the Cisco Square Bridge logo, Follow Me Browsing, and StackWise are trademarks of Cisco Systems, Inc.; Changing the Way We Work, Live, Play, and Learn, and iQuick Study are service marks of Cisco Systems, Inc.; and Access Registrar, Aironet, ASIST, BPX, Catalyst, CCDA, CCDP, CCIE,...
  • Page 5: Table Of Contents

    Reporting Security Problems in Cisco Products Cisco Technical Support Website Submitting a Service Request xxxi Definitions of Service Request Severity Catalyst 2955 Hardware Installation Guide C O N T E N T S xxix xxxi xxxii xiii...
  • Page 6 Entering the Initial Configuration Information Overview C H A P T E R Features Front-Panel Description Rear-Panel Description Catalyst 2955 Switch Power Converter Management Options Installation C H A P T E R Preparing for Installation Catalyst 2955 Hardware Installation Guide...
  • Page 7 Attach the Power and Relay Connector to the Switch Power On the Switch 3-27 Running POST 3-27 Preparing the AC Power Cord 3-35 Connecting the AC Power Cord to the Power Converter 3-52 3-57 Catalyst 2955 Hardware Installation Guide Contents 3-11 3-13 3-24 3-25 3-29 3-30 3-35 3-37...
  • Page 8 C H A P T E R Preparing for Installation Applying the Switch Protective Liner Verifying Switch Operation Wiring the External Alarm Device Relays Installing the Switch on a DIN Rail Catalyst 2955 Hardware Installation Guide viii 3-69 Warnings EMC Regulatory Statements U.S.A.
  • Page 9 Four Twisted-Pair Cable Pinouts for 10/100 Ports Four Twisted-Pair Cable Pinouts for 1000BASE-T Ports Cable and Adapter Pinouts Connecting to a PC Connecting to a Terminal B-10 Identifying a Crossover Cable Catalyst 2955 Hardware Installation Guide 4-45 4-47 4-50 4-52 B-11 Contents...
  • Page 10 SELV-IEC 60950 DC Power Supply Jewelry Removal Warning Product Disposal Warning Class 1 Laser Product Class 1 LED Product Laser Radiation Laser Viewing Warning Laser Beam Exposure Catalyst 2955 Hardware Installation Guide C-11 C-15 C-18 C-22 C-24 C-27 C-29 C-32...
  • Page 11 Contents Chassis Warning for Rack-Mounting and Servicing C-58 Grounded Equipment Warning C-66 Qualified Personnel Warning C-68 Restricted Area C-69 Chassis Power Connection C-72 Exposed DC Power Wire Warning C-75 N D E X Catalyst 2955 Hardware Installation Guide 78-14944-03...
  • Page 12 Contents Catalyst 2955 Hardware Installation Guide 78-14944-03...
  • Page 13: Cisco Limited 5-Year Hardware And 1-Year Software Warranty Terms

    The Cisco Limited Warranty and Software License page from the Information Packet appears. Read the document online, or click the PDF icon to download and print the document in Adobe Portable Document Format (PDF). 78-14944-03 Catalyst 2955 Hardware Installation Guide xiii...
  • Page 14 Contact the company from whom you purchased the product. If you purchased the product directly from Cisco, contact your Cisco Sales and Service Representative. Catalyst 2955 Hardware Installation Guide Cisco Limited 5-Year Hardware and 1-Year Software Warranty Terms You must have Adobe Acrobat Reader to view and print PDF files.
  • Page 15 Cisco Limited 5-Year Hardware and 1-Year Software Warranty Terms Complete the information below, and keep it for reference. Company product purchased from Company telephone number Product model number Product serial number Maintenance contract number Catalyst 2955 Hardware Installation Guide 78-14944-03...
  • Page 16 Cisco Limited 5-Year Hardware and 1-Year Software Warranty Terms Catalyst 2955 Hardware Installation Guide 78-14944-03...
  • Page 17: Preface

    Audience This guide is for the networking or computer technician responsible for installing a Catalyst 2955 switch, hereafter referred to as the switch. We assume that you are familiar with the concepts and terminology of Ethernet and local area networking.
  • Page 18: Conventions

    Gebruik het nummer van de verklaring onderaan de waarschuwing als u een vertaling van de waarschuwing die bij het apparaat wordt geleverd, wilt raadplegen. BEWAAR DEZE INSTRUCTIES Catalyst 2955 Hardware Installation Guide xviii 78-14944-03...
  • Page 19 Vorbeugung vor Unfällen vertraut. Suchen Sie mit der am Ende jeder Warnung angegebenen Anweisungsnummer nach der jeweiligen Übersetzung in den übersetzten Sicherheitshinweisen, die zusammen mit diesem Gerät ausgeliefert wurden. BEWAHREN SIE DIESE HINWEISE GUT AUF. 78-14944-03 Catalyst 2955 Hardware Installation Guide Conventions...
  • Page 20 Utilize o número da instrução fornecido ao final de cada aviso para localizar sua tradução nos avisos de segurança traduzidos que acompanham este dispositivo. GUARDE ESTAS INSTRUÇÕES Catalyst 2955 Hardware Installation Guide Preface 78-14944-03...
  • Page 21 Använd det nummer som finns i slutet av varje varning för att hitta dess översättning i de översatta säkerhetsvarningar som medföljer denna anordning. SPARA DESSA ANVISNINGAR Catalyst 2955 Hardware Installation Guide 78-14944-03...
  • Page 22 Preface Conventions Catalyst 2955 Hardware Installation Guide xxii 78-14944-03...
  • Page 23 Preface Conventions Catalyst 2955 Hardware Installation Guide xxiii 78-14944-03...
  • Page 24 Preface Conventions Catalyst 2955 Hardware Installation Guide xxiv 78-14944-03...
  • Page 25 Preface Conventions Catalyst 2955 Hardware Installation Guide 78-14944-03...
  • Page 26: Related Publications

    Cisco.com for the latest information. Catalyst 2950 and Catalyst 2955 Switch Software Configuration Guide • (order number DOC-7811380=) Catalyst 2950 and Catalyst 2955 Switch Command Reference (order number • DOC-7811381=) Catalyst 2950 and Catalyst 2955 Switch System Message Guide •...
  • Page 27: Cisco.com

    Documentation DVD (product number DOC-DOCDVD=) from the Ordering tool or Cisco Marketplace. Cisco Ordering tool: http://www.cisco.com/en/US/partner/ordering/ Cisco Marketplace: http://www.cisco.com/go/marketplace/ Ordering Documentation You can find instructions for ordering documentation at this URL: http://www.cisco.com/univercd/cc/td/doc/es_inpck/pdi.htm 78-14944-03 Obtaining Documentation Catalyst 2955 Hardware Installation Guide xxvii...
  • Page 28: Documentation Feedback

    Ordering tool: http://www.cisco.com/en/US/partner/ordering/ Nonregistered Cisco.com users can order documentation through a local • account representative by calling Cisco Systems Corporate Headquarters (California, USA) at 408 526-7208 or, elsewhere in North America, by calling 1 800 553-NETS (6387). Documentation Feedback You can send comments about technical documentation to bug-doc@cisco.com.
  • Page 29: Reporting Security Problems In Cisco Products

    In an emergency, you can also reach PSIRT by telephone: 1 877 228-7302 • 1 408 525-6532 • 78-14944-03 security-alert@cisco.com psirt@cisco.com Catalyst 2955 Hardware Installation Guide Cisco Product Security Overview xxix...
  • Page 30: Obtaining Technical Assistance

    Search results show an illustration of your product with the serial number label location highlighted. Locate the serial number label on your product and record the information before placing a service call. Catalyst 2955 Hardware Installation Guide Preface 78-14944-03...
  • Page 31: Submitting A Service Request

    Cisco products. You and Cisco will commit full-time resources during normal business hours to resolve the situation. 78-14944-03 Obtaining Technical Assistance Catalyst 2955 Hardware Installation Guide xxxi...
  • Page 32: Obtaining Additional Publications And Information

    You can access Packet magazine at this URL: http://www.cisco.com/packet iQ Magazine is the quarterly publication from Cisco Systems designed to • help growing companies learn how they can use technology to increase revenue, streamline their business, and expand services.
  • Page 33 Preface Internet Protocol Journal is a quarterly journal published by Cisco Systems • for engineering professionals involved in designing, developing, and operating public and private internets and intranets. You can access the Internet Protocol Journal at this URL: http://www.cisco.com/ipj World-class networking training is available from Cisco. You can view •...
  • Page 34 Preface Obtaining Additional Publications and Information Catalyst 2955 Hardware Installation Guide xxxiv 78-14944-03...
  • Page 35: Configuring The Switch With The Cli-Based Setup Program

    Ethernet ports, Chapter 3, “Installation.” If you are installing your switch in a hazardous environment, review the safety Caution warnings in installation procedures for a hazardous environment, see in a Hazardous Environment.”...
  • Page 36 Note ports to other Ethernet devices. Connecting to a Power Source For instructions on connecting the Catalyst 2955 switch to direct current (DC) power, see the instructions on connecting the Catalyst 2955 switch to alternating current (AC) or DC power by using the optional power converter, see the to the Power Converter”...
  • Page 37 If POST fails on the Catalyst 2955T-12: Uplink port 1 LED blinks amber. • • Uplink port 2 LED turns green. POST failures are usually fatal. Call Cisco Systems immediately if your switch Note does not pass POST. See the page xxx.
  • Page 38: Connecting To The Console Port

    Do not connect or disconnect cables to the ports while power is applied to the Warning switch or any device on the network because an electrical arc can occur. This could cause an explosion in hazardous location installations. Be sure that power is removed from the switch and cannot be accidentally be turned on, or verify that the area is nonhazardous before proceeding.
  • Page 39: Starting The Terminal-Emulation Software

    Figure 1-2 Catalyst 2955 switch Starting the Terminal-Emulation Software Before you power on the switch, start the terminal-emulation session on your PC so that you can see the output display from the power-on self-test (POST). 78-14944-03 Starting the Terminal-Emulation Software...
  • Page 40: Entering The Initial Configuration Information

    If you connect or disconnect the console cable with power applied to the Warning switch or any device on the network, an electrical arc can occur. This could cause an explosion in hazardous location installations. Be sure that power is removed or the area is nonhazardous before proceeding.
  • Page 41: Ip Settings

    Step 2 On a command switch, the host name is limited to 28 characters; on a member switch to 31 characters. Do not use -n, where n is a number, as the last character in a host name for any switch.
  • Page 42 Network Assistant application. To configure SNMP later, enter no. Configure SNMP Network Management? [no]: no Note For instructions on how to configure SNMP, see the switch software configuration guide. Enter the interface name (physical interface or virtual local-area network Step 7 [VLAN] name) of the interface that connects to the management network, and press Return.
  • Page 43 If you enter N, the switch appears as a candidate switch in the Network Assistant GUI. You can configure the switch as a command switch later through the CLI, the device manager, or the Network Assistant application.
  • Page 44 [1] Return back to the setup without saving this config. [2] Save this configuration to nvram and exit. If you want to save the configuration and use it the next time the switch reboots, save it in nonvolatile RAM (NVRAM) by selecting option 2.
  • Page 45: Overview

    Catalyst switches are a series of Ethernet switches that you can use to connect any Ethernet-enabled devices. The Catalyst 2955 switch is an Ethernet switch that mounts on a DIN rail in an industrial enclosure as well as in a standard 19-inch rack. Its components are designed to withstand extremes in temperature, vibration, and shock so that the switch can be deployed in an industrial environment.
  • Page 46: Chapter 2 Overview

    For 100BASE-FX multimode fiber-optic MM uplink ports, supports only 100-Mbps and full-duplex settings For 100BASE-LX single-mode fiber-optic SM uplink ports, supports – only100-Mbps and full-duplex settings Catalyst 2955 Hardware Installation Guide through Figure 2-3 show the Catalyst 2955 switches. Chapter 2...
  • Page 47: Front-Panel Description

    Chapter 2 Overview Front-Panel Description The switch front panel contains the ports, the LEDs, and the power and relay cable connector. Figure 2-1 Figure 2-1 10/100/1000 uplink ports Functional ground screw Power and relay connector 78-14944-03 Figure 2-3 show the switch front panels.
  • Page 48 Front-Panel Description Figure 2-2 100BASE-FX uplink ports Functional ground screw Power and relay connector Catalyst 2955 Hardware Installation Guide Catalyst 2955C-12 Switch C O N S O L E 1 0 0 B a s e -F X A L A R M...
  • Page 49: Warning Labels

    Warning Labels The laser safety warning label (as shown in Catalyst 2955C-12 and 2955S-12 switch front panels. The MM fiber-optic ports on the Catalyst 2955C-12 are Class 1 LEDs. The SM fiber-optic uplink ports on the Catalyst 2955S-12 are Class 1 laser products.
  • Page 50: 10/100 Ports

    Front-Panel Description Figure 2-4 The hot surface warning label (shown in 2955S-12, and 2955T-12 switch front panels. This label means that the surface of the switch is hot. See information about proper handling guidelines for hot surfaces. Figure 2-5 10/100 Ports The 10/100 ports use RJ-45 connectors and twisted-pair cabling.
  • Page 51: 10/100/1000 Ports

    • routers, and other switches, through standard RJ-45 connectors and four twisted-pair, Category 5 cabling. When connecting the switch to a 1000BASE-T device, be sure to use a four Note twisted-pair, Category 5 cable. When connecting the switch to workstations, servers, and routers, be sure to use Note a twisted-pair straight-through cable.
  • Page 52: 100Base-Fx Ports

    100BASE-LX Ports The 100BASE-LX ports on the Catalyst 2955S-12 use 9/125-micron SM fiber-optic cabling. The cable length from a switch to an attached device cannot exceed 9.375 miles (15 kilometers). For SM connections, use one of the connectors listed in...
  • Page 53 DC power connection is labeled VB, and the return is the adjacent connection labeled RT. The Catalyst 2955 switch can operate with a single power supply or with dual power supplies. In dual-power mode, the switch draws power from the power supply with higher voltage.
  • Page 54: Console Port

    You can use the LEDs to monitor switch activity and performance. The LEDs on all Catalyst 2955 switches are on the bottom edge of the front panel. The LEDs are visible in both face-up and parallel mounting configurations, as shown in Figure 2-7 The 10/100 port status LEDs show port status only.
  • Page 55 - T / 1 0 0 B a s e - T X 9 1 0 1 1 1 2 Alarm relay LEDs Power supply LEDs Catalyst 2955 Hardware Installation Guide Front-Panel Description 1 1 x 1 2 x M A J M 2-11...
  • Page 56: Power Status Leds

    Uplink port status LEDs Power Status LEDs The Catalyst 2955 switch can operate with one or two power supplies. Each power supply input has an associated LED that shows the power supply status. If the switch is in single-power mode and only power supply A is present and functioning, the LED for power supply B is green, and the LED for power supply A shows its status.
  • Page 57 Table 2-1 Note The power status LEDs show that power is not present on the switch if the power input drops below 17 V. The power status LEDs only show that power is present if the voltage at the switch input exceeds 18.5 V. The 1.5 V difference, or hysteresis, ensures that the power status LEDs do not oscillate at values near 18 V.
  • Page 58: Uplink Port Status Leds

    Solid amber Uplink Port Status LEDs The Catalyst 2955 switch has two uplink port status LEDs to the right of the port status LEDs. On the Catalyst 2955C-12 and 2955S-12 switches, the fiber-optic uplink port status LEDs are labeled 13 and 14 (see...
  • Page 59 Activity. Port is transmitting or receiving data. Link is faulty. Link is disabled. 100BASE-LX SM Uplink Port Status LEDs System Status No link. Link is present. Link is faulty. Link is disabled. Catalyst 2955 Hardware Installation Guide Front-Panel Description 2-15...
  • Page 60: Alarm Relay Leds

    CLI to associate port and global status alarms to one or both relays. See the switch software configuration guide for details. The switch relays are rated at 1 Amp and have a voltage limit of 30 VDC and 0.3 Warning Amp at a voltage limit of 125 VAC.
  • Page 61: Rear-Panel Description

    Chapter 2 Overview Rear-Panel Description The rear panel of the Catalyst 2955 switch has a DIN rail mounting clip assembly, as shown in The switch ships with the clip assembly installed on the rear panel, for a parallel mounting configuration.
  • Page 62 9 5 5 -A C DC positive connections DC return connections Earth ground connection Catalyst 2955 Hardware Installation Guide 2-18 shows the power converter. The Catalyst 2955 Switch AC/DC Power Converter AC line connection AC neutral connection Chapter 2 Overview 78-14944-03...
  • Page 63: Management Options

    You can manage switches by using command-line entries. To access the CLI, connect a PC or terminal directly to the console port on the switch. If the switch is attached to your network, you can use a Telnet connection to manage the switch from a remote location.
  • Page 64 • You can manage switches by using an SNMP-compatible management station running platforms such as HP OpenView and SunNet Manager. The switch supports a comprehensive set of MIB extensions and MIB II, the IEEE 802.1D bridge MIB, and four Remote Monitoring (RMON) groups. For more information, see the documentation that came with your SNMP application.
  • Page 65: Installation

    Installation This chapter describes how to install your switch, interpret the power-on self-test (POST), and connect the switch to other devices. If your installation is in a hazardous environment, see Note a Hazardous Environment,” Read these topics, and perform the procedures in this order: Preparing for Installation, page 3-2 •...
  • Page 66: Chapter 3 Installation

    Statement 1004 Warning Do not stack the chassis on any other equipment. If the chassis falls, it can cause severe bodily injury and equipment damage. Statement 88 Catalyst 2955 Hardware Installation Guide Chapter 3 Installation Appendix C, “Translated 78-14944-03...
  • Page 67 Use twisted-pair supply wires suitable for 86°F (30°C) above surrounding Warning ambient temperature outside the enclosure. Statement 1067 To prevent the switch from overheating, do not operate it in an area that Warning exceeds the maximum recommended ambient temperature of 140°F (60°C). To prevent airflow restriction, allow at least 3 inches (7.6 cm) of clearance around...
  • Page 68 DC circuit. To ensure that all power is OFF, locate the circuit breaker on the panel board that services the DC circuit, switch the circuit breaker to the OFF position, and tape the switch handle of the circuit breaker in the OFF position. Statement 140...
  • Page 69 100 mm may harm your eyes. For collimated beams, viewing the laser output with certain optical instruments designed for use at a distance may harm your eyes. Statement 282 78-14944-03 Preparing for Installation Catalyst 2955 Hardware Installation Guide...
  • Page 70: Emc Regulatory Statements

    This equipment is suitable for use in Class I, Division 2, Groups A, B, C, D, or Caution non-hazardous locations only. EMC Regulatory Statements This section includes specific regulatory statements about the Catalyst 2955 family of switches. U.S.A. U.S. regulatory information for this product is in the front matter of this manual.
  • Page 71: Vcci Class A Notice For Japan

    This is a Class A Device and is registered for EMC requirements for industrial Warning use. The seller or buyer should be aware of this. If this type was sold or purchased by mistake, it should be replaced with a residential-use type. Statement 294 78-14944-03 Preparing for Installation Catalyst 2955 Hardware Installation Guide...
  • Page 72: Class A Warning For Hungary

    POST. Follow the procedures in the the Switch and Running POST” section on page • For 10/100 ports and 10/100/1000 ports, the cable length from a switch to an attached device cannot exceed 328 feet (100 meters). •...
  • Page 73: Verifying Package Contents

    If any item is missing or damaged, contact your Cisco representative or reseller for support. Return all packing materials to the shipping container and save them. The switch is shipped with these items: Catalyst 2955 Hardware Installation Guide (Cisco part number • DOC-7814944=) •...
  • Page 74: Applying The Switch Protective Liner

    Note Thomas & Bett part number RC10-14 or equivalent). If you want to connect a terminal to the switch console port, you need to provide an RJ-45-to-DB-25 female DTE adapter. You can order a kit (part number ACS-DSBUASYN=) with that adapter from Cisco.
  • Page 75: Verifying Switch Operation

    Verifying Switch Operation Before installing the switch on a DIN rail or in a 19-inch rack, you should power on the switch and verify that the switch passes POST. These sections describe the steps required to connect a PC to the switch console port, to power on the switch,...
  • Page 76 One stop bit • No parity • After gaining access to the switch, you can change the port baud rate. See the switch software configuration guide for instructions. Step 3 Insert the adapter cable in the console port, as shown in “Cable and Adapter Pinouts”...
  • Page 77: Powering On The Switch And Running Post

    Start the terminal-emulation software. Step 6 Powering On the Switch and Running POST These sections describe the steps required to power on the switch and to observe POST: Grounding the Switch, page 3-15 Wiring the DC Power Source, page 3-17...
  • Page 78 Verifying Switch Operation The Catalyst 2955 switch can be used with an optional AC/DC power converter Note (PWR-2955-AC=) in a nonhazardous location installation. For instructions on how to connect the power converter to the switch, see the “Connecting the Switch to the Power Converter” section on page Locate the power and relay connector, the ferrite, and the switch installation protective liner in the switch kit.
  • Page 79: Grounding The Switch

    Use a standard Phillips screwdriver or a ratcheting torque screwdriver with a Step 1 Phillips head to remove the ground screw from the front panel of the switch. Store the ground screw for later use. If your ground wire is insulated, use a wire stripping tool to strip the 10- to Step 2 12-gauge ground wire to 0.5 inch (12.7 millimeter [mm]) ±...
  • Page 80 Slide the ground screw through the ring terminal. Step 4 Insert the ground screw into the functional ground screw opening on the front Step 5 panel. Catalyst 2955 Hardware Installation Guide 3-16 Stripping the Ground Wire Wire lead Crimping the Ring Terminal...
  • Page 81: Wiring The Dc Power Source

    Chapter 3 Installation Using a ratcheting torque screwdriver, tighten the ground screw and ring terminal Step 6 lug to the switch front panel to 15 in-lbs. (240 ounce-force inches [ozf-in.]), as shown in Figure 3-4 Grounding cable Attach the other end of the ground wire to a grounded bare metal surface, such as Step 7 a ground bus, a grounded DIN rail, or a grounded bare rack.
  • Page 82 DC circuit. To ensure that all power is OFF, locate the circuit breaker on the panel board that services the DC circuit, switch the circuit breaker to the OFF position, and tape the switch handle of the circuit breaker in the OFF position. Statement 140...
  • Page 83 Chapter 3 Installation To wire the switch to a DC-input power source, follow these steps: Locate the power and relay connector (see Step 1 Figure 3-5 Identify the positive and return feed positions for the power and relay connector. Step 2 The positive DC power connection from power supply A is labeled VA, and the return is the adjacent connection labeled RT.
  • Page 84 External device 1, relay wire A connection External device 2, relay wire A connection Catalyst 2955 Hardware Installation Guide 3-20 Inserting Wires in the Power and Relay Connector External device 2, relay wire B connection External device 1, relay wire B...
  • Page 85 Do not overtorque the power and relay connector captive screws. The Caution recommended maximum torque is 4.5 in-lbs. Figure 3-8 Power and relay connector captive screws 78-14944-03 Figure 3-8.) Torquing the Power and Relay Connector Captive Screws Catalyst 2955 Hardware Installation Guide Verifying Switch Operation 3-21...
  • Page 86 DC-input (VB) and return (RT) for power supply B. Figure 3-9 for a primary power supply and an optional secondary power supply. Catalyst 2955 Hardware Installation Guide 3-22 shows the completed DC-input wiring on a power and relay connector...
  • Page 87 Completed DC Power Connections on the Power and Relay Connector External device 2, relay wire B connection External device 1, relay wire B connection Power supply B return connection Power supply B positive connection Catalyst 2955 Hardware Installation Guide Verifying Switch Operation 3-23...
  • Page 88: Add The Ferrite To The Power And Relay Connector Wiring

    Loop the wiring around the ferrite (see Step 2 Figure 3-10 Press the ferrite closed until the clasp snaps shut (see Step 3 Catalyst 2955 Hardware Installation Guide 3-24 Figure 3-10). Wire Looped Through the Ferrite Chapter 3 Installation “Wiring...
  • Page 89: Attach The Power And Relay Connector To The Switch

    Secure the wires coming from the power and relay connector so that they cannot Caution be disturbed by casual contact. For example, use tie wraps to secure the wires to the rack. 78-14944-03 Clasping the Ferrite Figure Catalyst 2955 Hardware Installation Guide Verifying Switch Operation 3-12). 3-25...
  • Page 90 Power and relay connector Use a flathead screwdriver to tighten the captive screws on the sides of the power Step 2 and relay connector. Catalyst 2955 Hardware Installation Guide 3-26 Connecting the Power and Relay Connector to the Switch C O N S...
  • Page 91: Power On The Switch

    Failure to remove the protective liner could result in thermal damage to the switch. To apply power to a switch that is directly connected to a DC power source, locate the circuit breaker on the panel board that services the DC circuit, and switch the circuit breaker to the ON position.
  • Page 92 On a Catalyst 2950 switch, you can use the MODE button to recover the switch password. The Catalyst 2955 switch has no MODE button, so the boot loader compensates by using break key detection to stop the automatic boot sequence for password recovery.
  • Page 93: Connecting The Switch To The Power Converter

    Decide where you want to install the switch. Connecting the Switch to the Power Converter The Catalyst 2955 switch can be used with an optional AC/DC power converter (PWR-2955-AC=) in a nonhazardous location installation. To prevent the Catalyst 2955 switch from overheating, there must be a minimum Caution of 3 inches between any other device and the top, bottom, or sides of the switch.
  • Page 94: Installing The Power Converter On A Din Rail

    The enclosure must meet IP 54 or NEMA type 4 minimum enclosure rating standards. Statement 1063 To prevent the Catalyst 2955 switch from overheating, there must be a minimum Caution of 3 inches between any other device and the top, bottom, or sides of the switch.
  • Page 95 Press down lightly on the top of the power converter to ensure that it is firmly Step 3 locked in place. 78-14944-03 Connecting the Switch to the Power Converter Mounting the Power Converter on a DIN Rail Clip release tab Catalyst 2955 Hardware Installation Guide Figure 3-13. 3-31...
  • Page 96: Connecting The Power Converter To The Power And Relay Connector

    (such as Belden part number 9318). You must also use the ferrite that ships with the switch. Locate the Catalyst 2955 switch power and relay connector (see Step 1 Identify the positive and return feed positions for the power and relay connector.
  • Page 97 Measure a strand of twisted-pair copper wire (18 AWG) long enough to connect Step 3 the power converter to the switch. Ensure that the wire is long enough to loop through the ferrite and still maintain 4 inches of thermal spacing between the switch and the power converter.
  • Page 98 If you plan to connect external alarm devices to the alarm relays, go to the Note the External Alarm Device Relays” section on page Before you connect the power and relay connector to the switch front panel, follow the steps in the section on page 3-24...
  • Page 99: Connecting The Power Converter To An Ac Power Source

    Brown Blue Green/yellow United States Color Black White Green 78-14944-03 Connecting the Switch to the Power Converter AC Power Cord Color Codes Meaning Line Neutral Earth ground Meaning Line Neutral Earth ground Catalyst 2955 Hardware Installation Guide Table 3-1. 3-35...
  • Page 100 Strip the inner wire insulation to 0.25 inch (6.3 mm) ± 0.02 inch (0.5 mm), as Step 3 shown in Figure Figure 3-15 0.25 inch (6.35 mm) Catalyst 2955 Hardware Installation Guide 3-36 3-15. Preparing the AC Power Cord 0.75 inch (19.05 mm) Chapter 3...
  • Page 101: Connecting The Ac Power Cord To The Power Converter

    Figure 3-16 Input voltage selector Neutral wire connection 78-14944-03 Connecting the Switch to the Power Converter AC/DC Power Input Terminal Block and Input Voltage Selector Line wire connection Earth ground wire connection Catalyst 2955 Hardware Installation Guide 3-37...
  • Page 102 Step 6 Table 3-2 lists power converter input voltages and the corresponding input voltage selector settings. Catalyst 2955 Hardware Installation Guide 3-38 Figure 3-17). Make sure that you cannot see any wire lead. Connecting AC Power to the Power Converter Table 3-2.)
  • Page 103 Output Current 230 V 2.5 A 230 V 1.5 A 115 V 2.5 A 230 V 2.5 A 230 V 230 V 1.5 A shows the completed wiring for the power converter and a Catalyst 2955 Hardware Installation Guide 3-39...
  • Page 104 Power and relay connector 4 inches of thermal spacing DC output wires Catalyst 2955 Hardware Installation Guide 3-40 The Power Converter Connected to the Catalyst 2955 Switch and an AC Power Source C O N S O LE 10 0B as...
  • Page 105: Connecting The Power Converter To A Dc Power Source

    95 VDC. To ensure proper operation after the Catalyst 2955 switch has powered on, the input voltage to the power converter cannot drop below 80 VDC. To guarantee 24 VDC at 2.5 A to the Catalyst 2955 switch, the input power to the power converter must remain between 160 and 375 VDC.
  • Page 106 Statement 1067 When installing the unit, always make the ground connection first and Warning disconnect it last. Statement 42 Catalyst 2955 Hardware Installation Guide 3-42 Power Converter Connected to a DC Power Source N L PE...
  • Page 107 Only wire with insulation should extend from the connection. (See Step 6 Tighten the earth ground wire connection terminal block screw. 78-14944-03 Connecting the Switch to the Power Converter Figure 3-2.) Figure 3-20.) Catalyst 2955 Hardware Installation Guide 3-43...
  • Page 108 Ensure that only wire with insulation extends from the connectors. (See Tighten the line and neutral terminal block screws. Step 8 Catalyst 2955 Hardware Installation Guide 3-44 AC/DC Power Input Terminal Block Wire Connections to a DC Source Figure 3-20.)
  • Page 109 DC output wires 78-14944-03 Connecting the Switch to the Power Converter shows the completed wiring for the power converter and a The Power Converter Connected to the Catalyst 2955 Switch and a DC Power Source C O N S O LE...
  • Page 110: Applying Power To The Power Converter

    The LED is off when the unit is not operating normally. After the power is connected, the switch automatically begins the power-on self test (POST), a series of tests that verifies that the switch functions properly. For instructions on how to interpret POST results, see the...
  • Page 111 Chapter 3 Installation Figure 3-22 DIN rail clip DIN rail 78-14944-03 Connecting the Switch to the Power Converter Removing the Power Converter from a DIN Rail Clip release tab Catalyst 2955 Hardware Installation Guide 3-47...
  • Page 112: Wiring The External Alarm Device Relays

    Wiring the External Alarm Device Relays Wiring the External Alarm Device Relays The alarm relays on the Catalyst 2955 switch are normally open (NO). To connect an external alarm device to the relays, you must connect two relay contact wires to complete an electrical circuit.
  • Page 113 Inserting Relay Wires into the Power and Relay Connector External device 2, relay wire B connection External device 1, relay wire B connection Power supply B return connection Power supply B positive connection for details.) Catalyst 2955 Hardware Installation Guide 3-49...
  • Page 114 Power and relay connector captive screws Repeat Step 1 through Step 4 to insert the input and output wires of an additional Step 5 external alarm device into the two connections labeled A2. Catalyst 2955 Hardware Installation Guide 3-50 78-14944-03...
  • Page 115 Completed Connections for Two External Alarm Devices on the Power and Relay Connector Catalyst 2955 Hardware Installation Guide Wiring the External Alarm Device Relays External device 2, relay wire B...
  • Page 116: Installing The Switch On A Din Rail

    3-25 front panel. Installing the Switch on a DIN Rail You can mount the Catalyst 2955 switch on a DIN rail in a parallel or a face-down position. This equipment is supplied as “open type” equipment. It must be mounted...
  • Page 117 Chapter 3 Installation Figure 3-26 Catalyst 2955 switch rear panel DIN rail clip assembly 78-14944-03 Catalyst 2955 Switch Rear Panel DIN rail clip mounting screws Catalyst 2955 Hardware Installation Guide Installing the Switch on a DIN Rail 3-53...
  • Page 118 To attach the switch to a DIN rail, follow these steps. Step 1 Position the rear panel of the switch directly in front of the DIN rail, making sure that the top of the DIN rail clip hooks over the top of the DIN rail, as shown in...
  • Page 119 Chapter 3 Installation Figure 3-28 DIN rail clip DIN rail 78-14944-03 Mounting the Switch on a DIN Rail in a Parallel Position DIN rail clip release tab Catalyst 2955 Hardware Installation Guide Installing the Switch on a DIN Rail 3-55...
  • Page 120 Rotate the switch down toward the DIN rail until the release tab on the rear panel Step 2 clicks. Lift lightly on the bottom of the switch to ensure that it is firmly locked in place. Step 3 After the switch is mounted on the DIN rail, power on the switch as described in “Powering On the Switch and Running POST”...
  • Page 121: Installing The Switch In A Rack

    You can use an optional DIN rail adapter kit (available through Cisco, part number STK-RACKMNT-2955=) to mount the Catalyst 2955 switch in a 19-inch rack. The rack mounting kit comes with a DIN rail adapter and screws to attach the adapter to the rack.
  • Page 122 Rotate the switch down toward the DIN rail until the release tab on the rear panel clicks. Step 4 Lift lightly on the bottom of the switch to ensure that it is firmly locked in place. Figure 3-28 Catalyst 2955 Hardware Installation Guide...
  • Page 123: Removing The Switch From A Din Rail Or A Rack

    Switch from a DIN Rail or a Rack” section on page Removing the Switch from a DIN Rail or a Rack To remove the switch from a DIN rail or a rack, follow these steps: Ensure that power is removed from the switch, and disconnect all cables and Step 1 connectors from the front panel of the switch.
  • Page 124 Removing the Switch from a DIN Rail or a Rack Figure 3-32 DIN rail clip DIN rail Catalyst 2955 Hardware Installation Guide 3-60 Removing the Switch from a Parallel Mounting Position DIN rail clip release tab Chapter 3 Installation 78-14944-03...
  • Page 125 Chapter 3 Installation Figure 3-33 DIN rail clip DIN rail 78-14944-03 Removing the Switch from a DIN Rail or a Rack Removing the Switch from a Face-Down Mounting Position DIN rail clip release tab Catalyst 2955 Hardware Installation Guide 3-61...
  • Page 126: Connecting To 10/100 And 10/100/1000 Ports

    Connecting to 10/100 and 10/100/1000 Ports Connecting to 10/100 and 10/100/1000 Ports The 10/100 ports on the Catalyst 2955 configure themselves to operate at the speed and duplex settings of attached devices.They operate at 10 or 100 Mbps in half- or full-duplex mode. If the attached devices do not support autonegotiation, you can set the speed and duplex parameters.
  • Page 127 78-14944-03 3-35. When connecting to switches or repeaters, insert a twisted-pair “Cable and Adapter Specifications” section on page B-5 Connecting to a 10/100 Port on the Catalyst 2955 Switch C O N S O L E 1 0 0 B a...
  • Page 128 Step 2 Step 3 Observe the port status LED. The LED turns green when the switch and the target device have an established link. The LED turns amber while Spanning Tree Protocol (STP) discovers the network topology and searches for loops. This process can take about 30 seconds, and then the LED turns green.
  • Page 129: Connecting To 100Base-Fx Mm Ports

    The plugs and caps protect the fiber-optic ports and cables from contamination and ambient light. Follow these steps to connect the switch to a MM 100BASE-FX device: Remove the dust plugs from the 100BASE-FX port, as shown in Step 1 store them for future use.
  • Page 130 Insert the other cable end into the MT-RJ port on the target device. Observe the port status LED. Step 4 The LED turns green when the switch and the target device have an established link. The LED turns amber while STP discovers the network topology and searches for loops.
  • Page 131: Connecting To 100Base-Lx Sm Ports

    You can connect a 100BASE-LX port to a port on a target device by using one of the LC fiber-optic patch cables listed in numbers in Follow these steps to connect the switch to a 100BASE-LX SM device: Do not remove the dust plugs from the fiber-optic ports or the rubber caps from Caution the fiber-optic cable until you are ready to connect the cable.
  • Page 132 Step 3 Observe the port status LED. Step 4 The LED turns green when the switch and the target device have an established link. The LED turns amber while STP discovers the network topology and searches for loops. This process can take about 30 seconds, and then the port LED turns green.
  • Page 133: Where To Go Next

    Use the CLI from the console to configure the switch as a member of a cluster • or as an individual switch. See the Catalyst 2950 and Catalyst 2955 Switch Software Configuration Guide and the Catalyst 2950 and Catalyst 2955 Switch Command Reference on Cisco.com for information on using the CLI...
  • Page 134 Chapter 3 Installation Where to Go Next Catalyst 2955 Hardware Installation Guide 3-70 78-14944-03...
  • Page 135: Installation In A Hazardous Environment

    Installation in a Hazardous Environment This chapter describes how to install your switch in a hazardous environment, to interpret the power-on self-test (POST), and to connect the switch to other devices. Read these topics, and perform the procedures in this order: Preparing for Installation, page 4-2 •...
  • Page 136: Preparing For Installation

    Warning Do not stack the chassis on any other equipment. If the chassis falls, it can cause severe bodily injury and equipment damage. Statement 48 Catalyst 2955 Hardware Installation Guide Chapter 4 Installation in a Hazardous Environment Appendix C, “Translated...
  • Page 137 (SELV) requirements in IEC 60950 based safety standards. Statement 1033 The nominal voltage for this product is 24 V. When the switch is installed in Warning hazardous locations, the safe operating range of 18 to 30 VDC must be maintained.
  • Page 138 Preparing for Installation The switch relays are rated at 1 Amp and have a voltage limit of 30 VDC and 0.3 Warning Amp at a voltage limit of 125 VAC. It is dangerous to exceed these limitations in a hazardous environment.
  • Page 139 In switch installations in a hazardous location, the DC power source could be Warning located away from the vicinity of the switch. be sure that power is removed and power cannot be accidentally be turned on or the area is nonhazardous before proceeding.
  • Page 140 DC circuit. To ensure that all power is OFF, locate the circuit breaker on the panel board that services the DC circuit, switch the circuit breaker to the OFF position, and tape the switch handle of the circuit breaker in the OFF position. Statement 140...
  • Page 141 Avoid direct exposure to the laser beam. Statement 1012 Warning This equipment is suitable for use in Class I, Division 2, Groups A, B, C, D, or Caution non-hazardous locations only. 78-14944-03 Preparing for Installation Catalyst 2955 Hardware Installation Guide...
  • Page 142: Emc Regulatory Statements

    Preparing for Installation EMC Regulatory Statements This section includes specific regulatory statements about the Catalyst 2955 family of switches. U.S.A. U.S. regulatory information for this product is in the front matter of this manual. Class A Notice for Taiwan and Other Traditional Chinese Markets...
  • Page 143: Vcci Class A Notice For Japan

    This is a Class A Device and is registered for EMC requirements for industrial Warning use. The seller or buyer should be aware of this. If this type was sold or purchased by mistake, it should be replaced with a residential-use type. Statement 294 78-14944-03 Preparing for Installation Catalyst 2955 Hardware Installation Guide...
  • Page 144: Class A Warning For Hungary

    Category 3 equipment intended for use in potentially explosive atmospheres, given in Annex II to this Directive. Compliance with the Essential Health and Safety Requirements has been assured by compliance with EN 50021 (1999). Catalyst 2955 Hardware Installation Guide 4-10 Chapter 4 Installation in a Hazardous Environment...
  • Page 145: Installation Guidelines

    POST. Follow the procedures in the the Switch and Running POST” section on page For 10/100 ports and 10/100/1000 ports, the cable length from a switch to an • attached device cannot exceed 328 feet (100 meters).
  • Page 146: Verifying Package Contents

    Note Thomas & Bett part number RC10-14 or equivalent). If you want to connect a terminal to the switch console port, you need to provide an RJ-45-to-DB-25 female DTE adapter. You can order a kit (part number ACS-DSBUASYN=) with that adapter from Cisco.
  • Page 147: Applying The Switch Protective Liner

    The switch ships with a protective liner that prevents debris from falling into the switch ventilation holes during installation. Before installing the switch on a DIN rail or in a 19-inch rack, connecting the switch to a power source, or wiring the external alarm device relays, you must first apply the protective liner.
  • Page 148: Verifying Switch Operation

    To verify switch operation, perform POST on the switch in a nonhazardous location before installation. Statement 1065 Before installing the switch on a DIN rail or in a 19-inch rack, you should power on the switch and verify that the switch passes power-on self-test (POST). These...
  • Page 149 One stop bit • No parity • After gaining access to the switch, you can change the port baud rate. See the switch software configuration guide for instructions. Step 3 Insert the adapter cable in the console port, as shown in “Cable and Adapter Pinouts”...
  • Page 150: Powering On The Switch And Running Post

    If you connect or disconnect the console cable with power applied to the Warning switch or any device on the network, an electrical arc can occur. This could cause an explosion in hazardous location installations. Be sure that power is removed or the area is nonhazardous before proceeding.
  • Page 151 The AC/DC power converter (PWR-2955-AC=) can only be used in a Caution nonhazardous location installation. These sections describe the steps required to power on the switch and to observe POST: Grounding the Switch, page 4-18 Wiring the DC Power Source, page 4-21...
  • Page 152: Grounding The Switch

    Make sure to follow any grounding requirements at your site. Use a standard Phillips screwdriver or a ratcheting torque screwdriver with a Step 1 Phillips head to remove the ground screw from the front panel of the switch. Store the ground screw for later use. Step 2 If your ground wire is insulated, use a wire stripping tool to strip the 10- to 12-gauge ground wire to 0.5 inch (12.7 millimeter [mm]) ±...
  • Page 153 Slide the ground screw through the ring terminal. Step 4 Insert the ground screw into the functional ground screw opening on the front Step 5 panel. 78-14944-03 Stripping the Ground Wire Crimping the Ring Terminal Catalyst 2955 Hardware Installation Guide Verifying Switch Operation Wire lead 4-19...
  • Page 154 Verifying Switch Operation Using a ratcheting torque screwdriver, tighten the ground screw and ring terminal Step 6 lug to the switch front panel to 15 in-lbs. (240 ounce-force inches [ozf-in.]), as shown in Figure Figure 4-4 Grounding cable Attach the other end of the ground wire to a grounded bare metal surface, such as Step 7 a ground bus, a grounded DIN rail, or a grounded bare rack.
  • Page 155: Wiring The Dc Power Source

    Caution You must connect the Catalyst 2955 switch only to a DC-input power source that has an input supply voltage from 18 to 32 VDC. If the supply voltage is not in this range, the switch might not operate properly or might be damaged.
  • Page 156 1007 or 1569 twisted-pair copper appliance wiring material (AWM) wire (such as Belden part number 9318). You must also use the ferrite that ships with the switch. To wire the switch to a DC-input power source, follow these steps: Locate the power and relay connector (see Step 1 Figure 4-5 Identify the positive and return feed positions for the power and relay connector.
  • Page 157 An exposed wire lead from a DC-input power source can conduct harmful levels Warning of electricity. Be sure that no exposed portion of the DC-input power source wire extends from the power and relay connector. Statement 122 Catalyst 2955 Hardware Installation Guide 4-23 78-14944-03...
  • Page 158 (See Do not overtorque the power and relay connector captive screws. The Caution recommended maximum torque is 4.5 in-lbs. Catalyst 2955 Hardware Installation Guide 4-24 Chapter 4 Inserting Wires in the Power and Relay Connector External device 2, relay wire B...
  • Page 159 If you are connecting a second power supply, repeat Note for the DC-input (VB) and return (RT) for power supply B. 78-14944-03 Torquing the Power and Relay Connector Captive Screws Catalyst 2955 Hardware Installation Guide Verifying Switch Operation Step 4 through Step 7...
  • Page 160 External device 1, relay wire A connection External device 2, relay wire A connection Catalyst 2955 Hardware Installation Guide 4-26 Chapter 4 shows the completed DC-input wiring on a power and relay connector Completed DC Power Connections on the Power and Relay...
  • Page 161: Add The Ferrite To The Power And Relay Connector Wiring

    Step 2 Figure 4-10 Press the ferrite closed until the clasp snaps shut (see Step 3 78-14944-03 Figure 4-10). Wire Looped Through the Ferrite Catalyst 2955 Hardware Installation Guide Verifying Switch Operation “Wiring 4-32. Otherwise, go to the Figure 4-11). 4-27...
  • Page 162: Attach The Power And Relay Connector To The Switch

    Warning applied, an electrical arc can occur. This could cause an explosion in hazardous area installations. Be sure that power is removed from the switch and alarm circuit. Be sure that power cannot be accidentally turned on or verify that the area is nonhazardous before proceeding.
  • Page 163 -T X C IS C O C A TA LY ST 29 55 1 1 x 1 2 x 9 10 11 12 13 14 M A J M Catalyst 2955 Hardware Installation Guide Verifying Switch Operation 4-11). 4-29...
  • Page 164: Power On The Switch

    Warning If you connect or disconnect the console cable with power applied to the switch or any device on the network, an electrical arc can occur. This could cause an explosion in hazardous location installations. Be sure that power is removed or the area is nonhazardous before proceeding.
  • Page 165 On a Catalyst 2950 switch, you can use the MODE button to recover the switch password. The Catalyst 2955 switch has no MODE button, so the boot loader compensates by using break key detection to stop the automatic boot sequence for password recovery.
  • Page 166: Wiring The External Alarm Device Relays

    Decide where you want to install the switch. Wiring the External Alarm Device Relays The alarm relays on the Catalyst 2955 switch are normally open (NO). To connect an external alarm device to the relays, you must connect two relay contact wires to complete an electrical circuit.
  • Page 167 Chapter 4 Installation in a Hazardous Environment The switch relays are rated at 1 Amp and have a voltage limit of 30 VDC and 0.3 Warning Amp at a voltage limit of 125 VAC. It is dangerous to exceed these limitations in a hazardous environment.
  • Page 168 Step 4 connector captive screw (above the installed wire lead) to 4.5 in-lbs. (72 ozf-in.). (See Figure 4-14 Catalyst 2955 Hardware Installation Guide 4-34 Chapter 4 Inserting Relay Wires into the Power and Relay Connector External device 2, relay wire B...
  • Page 169 A2. 78-14944-03 Torquing the Power and Relay Connector Captive Screws through Step 4 to insert the input and output wires of an additional Catalyst 2955 Hardware Installation Guide Wiring the External Alarm Device Relays 4-35...
  • Page 170 External device 1, relay wire A connection External device 2, relay wire A connection Catalyst 2955 Hardware Installation Guide 4-36 Chapter 4 shows the completed wiring for two external alarm devices on a Completed Connections for Two External Alarm Devices on the...
  • Page 171: Installing The Switch On A Din Rail

    4-28 front panel. Installing the Switch on a DIN Rail You can mount the Catalyst 2955 switch on a DIN rail in a parallel or a face-down position. Warning This equipment is supplied as “open type” equipment. It must be mounted...
  • Page 172 Installing the Switch on a DIN Rail The switch ships with the clip assembly installed on the rear panel for a parallel mounting position, as shown in position, remove the clip assembly from the rear panel, and install it on the top of...
  • Page 173 To attach the switch to a DIN rail, follow these steps. Step 1 Position the rear panel of the switch directly in front of the DIN rail, making sure that the top of the DIN rail clip hooks over the top of the DIN rail, as shown in...
  • Page 174 Installing the Switch on a DIN Rail Figure 4-18 DIN rail clip DIN rail Catalyst 2955 Hardware Installation Guide 4-40 Chapter 4 Mounting the Switch on a DIN Rail in a Parallel Position DIN rail clip release tab Installation in a Hazardous Environment...
  • Page 175 Rotate the switch down toward the DIN rail until the release tab on the rear panel Step 2 clicks. Lift lightly on the bottom of the switch to ensure that it is firmly locked in place. Step 3 After the switch is mounted on the DIN rail, power on the switch as described in “Powering On the Switch and Running POST”...
  • Page 176: Installing The Switch In A Rack

    You can use an optional DIN rail adapter kit (available through Cisco, part number STK-RACKMNT-2955=) to mount the Catalyst 2955 switch in a 19-inch rack. The rack mounting kit comes with a DIN rail adapter and screws to attach the adapter to the rack.
  • Page 177 Rotate the switch down toward the DIN rail until the release tab on the rear panel Step 3 clicks. Lift lightly on the bottom of the switch to ensure that it is firmly locked in place. Step 4 Figure 4-21...
  • Page 178 After mounting the switch in the rack, start the terminal-emulation software, and provide power to the switch. See the POST” section on page 4-16 For instructions on how to remove the switch from a rack, see the Note Switch from a DIN Rail or a Rack” section on page...
  • Page 179: Removing The Switch From A Din Rail Or A Rack

    Installation in a Hazardous Environment Removing the Switch from a DIN Rail or a Rack To remove the switch from a DIN rail or a rack, follow these steps: Ensure that power is removed from the switch, and disconnect all cables and Step 1 connectors from the front panel of the switch.
  • Page 180 Removing the Switch from a DIN Rail or a Rack Figure 4-23 DIN rail clip DIN rail Catalyst 2955 Hardware Installation Guide 4-46 Chapter 4 Removing the Switch from a Face-Down Mounting Position DIN rail clip release tab Installation in a Hazardous Environment...
  • Page 181: Connecting To 10/100 And 10/100/1000 Ports

    Installation in a Hazardous Environment Connecting to 10/100 and 10/100/1000 Ports The 10/100 ports on the Catalyst 2955 configure themselves to operate at the speed and duplex settings of attached devices.They operate at 10 or 100 Mbps in half- or full-duplex mode. If the attached devices do not support autonegotiation, you can set the speed and duplex parameters.
  • Page 182 Chapter 4 4-25. When connecting to switches or repeaters, insert a twisted-pair “Cable and Adapter Specifications” section on page B-5 Connecting to a 10/100 Port on the Catalyst 2955 Switch C O N S O L E 1 0 0 B a...
  • Page 183 Step 2 Step 3 Observe the port status LED. The LED turns green when the switch and the target device have an established link. The LED turns amber while Spanning Tree Protocol (STP) discovers the network topology and searches for loops. This process can take about 30 seconds, and then the LED turns green.
  • Page 184: Connecting To 100Base-Fx Mm Ports

    Do not connect or disconnect cables to the ports while power is applied to the switch or any device on the network because an electrical arc can occur. This could cause an explosion in hazardous location installations. Be sure that power is removed from the switch and cannot be accidentally be turned on, or verify that the area is nonhazardous before proceeding.
  • Page 185 Insert the other cable end into the MT-RJ port on the target device. Observe the port status LED. Step 4 The LED turns green when the switch and the target device have an established link. The LED turns amber while STP discovers the network topology and searches for loops.
  • Page 186: Connecting To 100Base-Lx Sm Ports

    Do not connect or disconnect cables to the ports while power is applied to the switch or any device on the network because an electrical arc can occur. This could cause an explosion in hazardous location installations. Be sure that power is removed from the switch and cannot be accidentally be turned on, or verify that the area is nonhazardous before proceeding.
  • Page 187 C IS C O C A TA LY ST 29 55 1 1 x 1 2 x 9 10 11 12 13 14 M A J M Catalyst 2955 Hardware Installation Guide Connecting to 100BASE-LX SM Ports Figure 4-28, and 4-29.) 4-53...
  • Page 188: Where To Go Next

    Use the CLI from the console to configure the switch as a member of a cluster • or as an individual switch. See the Catalyst 2950 and Catalyst 2955 Switch Software Configuration Guide and the Catalyst 2950 and Catalyst 2955 Switch Command Reference on Cisco.com for information on using the CLI...
  • Page 189: Troubleshooting

    The front-panel LEDs provide troubleshooting information about the switch. They show power-on self-test (POST) failures, port-connectivity problems, and overall switch performance. For a full description of the LEDs, see the section on page You can also get statistics from the browser interface, the command-line interface (CLI), the Cisco Intelligence Engine 2100 (IE2100) Series Configuration Registrar, or a Simple Network Management Protocol (SNMP) workstation.
  • Page 190: Understanding Post Results

    Warning If you connect or disconnect the console cable with power applied to the switch or any device on the network, an electrical arc can occur. This could cause an explosion in hazardous location installations. Be sure that power is removed or the area is nonhazardous before proceeding.
  • Page 191: Diagnosing Problems

    On the Catalyst 2955T-12, the uplink ports are labeled 1 and 2. On the Catalyst 2955C-12 and 2955S-12, the uplink ports are labeled 13 and 14. POST failures are usually fatal. Call Cisco Systems immediately if your switch does not pass POST. See the page xxx.
  • Page 192 Table 5-1 Table 5-1 Common Problems and Solutions Symptom Poor performance or excessive errors. Catalyst 2955 Hardware Installation Guide describes how to detect and solve these problems. Possible Cause Duplex autonegotiation mismatch. Cabling distance exceeded. Port statistics show excessive •...
  • Page 193 • STP checking for possible • loops. Incorrect baud rate. Corrupted software. Fatal POST error detected. • Catalyst 2955 Hardware Installation Guide Diagnosing Problems Resolution For the correct pinouts and • the proper application of crossover vs. straight-through cables, see “Cable and Adapter...
  • Page 194 Chapter 5 Troubleshooting Diagnosing Problems Catalyst 2955 Hardware Installation Guide 78-14944-03...
  • Page 195: Appendix

    Table A-2 ports. Table A-4 technical specifications for the Catalyst 2955 switch power converter. lists the regulatory agency approvals for the Catalyst 2955 switch power converter. 78-14944-03 A P P E N D I X lists the technical specifications for the Catalyst 2955 switches.
  • Page 196 Power consumption Physical Dimensions Weight Dimensions (W x D x H) Catalyst 2955 Hardware Installation Guide Technical Specifications for Catalyst 2955T-12, 2955C-12, and Catalyst 2955S-12 Switches –40 to 140°F (–40 to 60°C) –40 to 185°F (–40 to 85°C) 10 to 95% (noncondensing)
  • Page 197 Optical transmitter power for 9/125-micron cabling 1. SM = single-mode fiber 2. nm = nanometer 3. dBm = decibel milliwatt Table A-4 Catalyst 2955 Switch Agency Approvals Safety UL 60950 CAN 22.2 No. 60950 UL 508 CB report to IEC 60950...
  • Page 198 BSMI Class A MIC Class A EN 61131-2 EN 55011 (CISPR 11) Class A lists the technical specifications for the Catalyst 2955 switch power Technical Specifications for the Power Converter 14 to 140°F (–10 to 60°C) –13 to 185°F (–25 to 85°C)
  • Page 199 1.3 A @ 115 V 1.01 lbs (0.460 kg) 1.97 x 4.05 x 4.92 in. (50 x 103 x 125 lists the regulatory agency approvals for the Catalyst 2955 switch Power Converter Agency Approvals EN 50081-1 and -2 (Emissions) EN 50082-1 and -2 (Immunity)
  • Page 200 Appendix A Technical Specifications Catalyst 2955 Hardware Installation Guide 78-14944-03...
  • Page 201: Appendix

    This appendix describes the connectors, cables, and adapters that you use to connect the switch to other devices. Connector Specifications These sections describe the connectors used with the Catalyst 2955 switches and contain this information: 10/100 and 10/100 /1000 Ports, page B-2 •...
  • Page 202: 10/100 And 10/100 /1000 Ports

    Connector Specifications 10/100 and 10/100 /1000 Ports The 10/100 and 10/100/1000 Ethernet ports on Catalyst 2955 switches use standard RJ-45 connectors and Ethernet pinouts with internal crossovers. Figure B-1 Figure B-1 Figure B-2 Catalyst 2955 Hardware Installation Guide Figure B-2 show the pinouts.
  • Page 203: 100Base-Fx Ports

    MT-RJ Connector MT-RJ Patch Cables for 100BASE-FX Connections Figure B-4. These ports use 9/125-micron single-mode fiber-optic Catalyst 2955 Hardware Installation Guide Connector Specifications Table B-1. Use the Cisco part Cisco Part Number...
  • Page 204: Power And Relay Connector

    The power and relay connector is a pluggable-screw terminal block connector that provides power and return connections for both the primary and secondary power supplies. The power and relay connector also gives the Catalyst 2955 switch the interfaces to two independent alarm relays.
  • Page 205: Cable And Adapter Specifications

    Cisco. For console-port and adapter-pinout information, see Table B-3 Cable and Adapter Specifications These sections describe the cables and adapters used with Catalyst 2955 switches. Two Twisted-Pair Cable Pinouts, page B-6 • Four Twisted-Pair Cable Pinouts for 10/100 Ports, page B-6 •...
  • Page 206: Two Twisted-Pair Cable Pinouts

    6 TD– 1 RD+ 2 RD– Four Twisted-Pair Cable Pinouts for 10/100 Ports Figure B-8 10/100 ports. Catalyst 2955 Hardware Installation Guide Figure B-7 show the schematics of two twisted-pair cables for Two Twisted-Pair Straight-Through Cable Schematic for 10/100 Ports Switch 3 RD+ 6 RD–...
  • Page 207 5 NC 7 NC 8 NC Four Twisted-Pair Crossover Cable Schematic for 10/100 Ports Switch 1 RD+ 2 RD- 3 TD+ 6 TD- 4 NC 5 NC 7 NC 8 NC Catalyst 2955 Hardware Installation Guide Cable and Adapter Specifications...
  • Page 208: Four Twisted-Pair Cable Pinouts For 1000Base-T Ports

    3 TP1+ 6 TP1- 4 TP2+ 5 TP2- 7 TP3+ 8 TP3- Catalyst 2955 Hardware Installation Guide Figure B-11 show the schematics of four twisted-pair cables for Four Twisted-Pair Straight-Through Cable Schematic for 10/100/1000 and 1000BASE-T Ports Router or PC...
  • Page 209: Cable And Adapter Pinouts

    Connecting the Console Port to a PC RJ-45-to-DB-9 adapter cable Console Port Signaling and RJ-45-to-DB-9 Adapter Cabling RJ-45-to-DB-9 Console Adapter Cable Device RJ-45 Pin DB-9 Pin Signal Catalyst 2955 Hardware Installation Guide Cable and Adapter Specifications shows how to connect the...
  • Page 210: Connecting To A Terminal

    RJ-45-to-DB-25 adapter. The RJ-45-to-DB-25 female DTE adapter is not supplied with the switch. You can Note order a kit (part number ACS-DSBUASYN=) with that adapter from Cisco.
  • Page 211: Identifying A Crossover Cable

    (See Figure B-14.) Figure B-14 Identifying a Crossover Cable Pin 1 on one connector and pin 8 on the other connector should be the same color. Pin 1 Pin 8 Catalyst 2955 Hardware Installation Guide B-11 78-14944-03...
  • Page 212 Appendix B Connectors and Cables Cable and Adapter Specifications Catalyst 2955 Hardware Installation Guide B-12 78-14944-03...
  • Page 213: Appendix

    Arbeiten Sie nicht am System und schließen Sie keine Kabel an bzw. trennen Warnung Sie keine ab, wenn es gewittert. Avvertenza Non lavorare sul sistema o collegare oppure scollegare i cavi durante un temporale con fulmini. Catalyst 2955 Hardware Installation Guide 78-14944-03...
  • Page 214: Appendix C Translated Safety Warning

    Vid åska skall du aldrig utföra arbete på systemet eller ansluta eller koppla loss kablar. Varning! Vid åska skall du aldrig utföra arbete på systemet eller ansluta eller koppla loss kablar. Catalyst 2955 Hardware Installation Guide Appendix C Translated Safety Warnings 78-14944-03...
  • Page 215: Power And Relay Connector

    Warning applied, an electrical arc can occur. This could cause an explosion in hazardous area installations. Be sure that power is removed from the switch and alarm circuit. Be sure that power cannot be accidentally turned on or verify that the area is nonhazardous before proceeding.
  • Page 216 Qualora non si serrassero perfettamente le viti prigioniere del connettore relè e di potenza, si potrebbe causare la formazione di un arco elettrico in caso di rimozione accidentale del connettore stesso. Catalyst 2955 Hardware Installation Guide 78-14944-03...
  • Page 217 Interrumpa el suministro de alimentación del switch y del circuito de alarma. Antes de continuar, asegúrese de que no se pueda volver a suministrar alimentación de forma accidental o compruebe que el área no sea peligrosa.
  • Page 218 Appendix C Translated Safety Warnings Power and Relay Connector Catalyst 2955 Hardware Installation Guide 78-14944-03...
  • Page 219: Switch Installation In Hazardous Location

    Translated Safety Warnings Switch Installation In Hazardous Location Switch Installation In Hazardous Location In switch installations in a hazardous location, the DC power source could be Warning located away from the vicinity of the switch. Before performing any of the...
  • Page 220: Switch Installation In Hazardous Location

    ¡Advertencia! En las instalaciones con switch que se encuentran en lugares peligrosos, la fuente de alimentación de CC debe estar alejada del switch. Antes de realizar ninguno de los siguientes procedimientos, localice el circuito de CC para asegurarse de que se ha interrumpido el suministro de alimentación y que no se puede volver a suministrar de forma accidental o compruebe que el área no...
  • Page 221: Safe Operating Voltage Range Warning

    Translated Safety Warnings Safe Operating Voltage Range Warning Safe Operating Voltage Range Warning The nominal voltage for this product is 24 V. When the switch is installed in Warning hazardous locations, the safe operating range of 18 to 32 VDC must be maintained.
  • Page 222 18 a 32 VDC. ¡Advertencia! El voltaje nominal para este producto es de 24 V. Cuando el switch se instala en lugares peligrosos, se debe mantener el rango operativo de seguridad: entre 18 y 32 V CC.
  • Page 223: Switch Relays Warning

    Switch Relays Warning Switch Relays Warning The switch relays are rated at 1 Amp and have a voltage limit of 30 VDC and 0.3 Warning Amp at a voltage limit of 125 VAC. It is dangerous to exceed these limitations in a hazardous environment.
  • Page 224: Switch Relays Warning

    Standort nicht um ein explosionsgefährdetes Gebiet handelt. Avvertenza I relè switch hanno una capacità nominale di 1 amp e una tensione limite di 30 VCC e capacità di 0,3 amp a una tensione limite di 125 VCA. È pericoloso superare questi limiti in un ambiente pericoloso.
  • Page 225 área é segura. ¡Advertencia! Los relés del switch son de 1 amp y su límite de voltaje es de 30 V CC y 0,3 amp a un límite de voltaje de 125 V CA. Resulta peligroso superar estos límites en un entorno de riesgo.
  • Page 226 Appendix C Translated Safety Warnings Switch Relays Warning Catalyst 2955 Hardware Installation Guide C-14 78-14944-03...
  • Page 227: Remove Power Before Disconnecting

    à cet équipement à l'aide de vis, de verrous à glissière, de connecteurs filetés ou d'autres dispositifs fournis avec ce produit. Toute substitution de composant est susceptible de rendre le produit incompatible avec les normes de Classe I, Division 2. Catalyst 2955 Hardware Installation Guide C-15 78-14944-03...
  • Page 228 A substituição de componentes pode prejudicar a compatibilidade com a Classe I, Divisão 2. Catalyst 2955 Hardware Installation Guide C-16 78-14944-03...
  • Page 229 är farligt. Sätt fast alla externa anslutningar till denna utrustning med skruvar, haspar, gängade kontaktdon, eller på något annat sätt som tillhandahållas med produkten. Om komponenterna substitueras kan detta påverka enhetens lämplighet för Klass I, Division 2. Catalyst 2955 Hardware Installation Guide C-17 78-14944-03...
  • Page 230: Open Type" Equipment

    De binnenkant van de kast mag alleen toegankelijk zijn d.m.v. een gereedschap. De kast dient minimaal te voldoen aan de IP 54-normen of de minimale normen voor NEMA type 4. Catalyst 2955 Hardware Installation Guide C-18 78-14944-03...
  • Page 231 La parte interna della struttura deve essere accessibile soltanto con l'ausilio di uno strumento. La struttura deve essere conforme alle norme di capacità minima strutturale IP 54 o NEMA di tipo 4. Catalyst 2955 Hardware Installation Guide C-19 78-14944-03...
  • Page 232 Enheten måste konstrueras så att man endast kan få åtkomst till höljets inre med hjälp av verktyg. Höljet måste uppfylla minimistandarderna för höljen enligt IP 54 eller NEMA typ 4. Catalyst 2955 Hardware Installation Guide C-20 78-14944-03...
  • Page 233 Appendix C Translated Safety Warnings “Open Type” Equipment Catalyst 2955 Hardware Installation Guide C-21 78-14944-03...
  • Page 234: Grounded Equipment

    Quest'apparecchiatura deve essere collegata a terra al fine di essere conforme ai requisiti di emissione e immunità. Assicurarsi che il terminale di terra funzionale dello switch sia collegato a massa durante l'uso normale. Advarsel Dette utstyret er beregnet på jording som samsvarer med kravene til utslipp og immunitet.
  • Page 235 Este equipo está diseñado para que se conecte a tierra de modo que cumpla con los requisitos de emisión e inmunidad. Asegúrese de que el terminal de tierra funcional del switch está conectado a tierra durante el uso normal. Varning! Denna utrustning bör jordas för att uppfylla gällande emissions- och...
  • Page 236: Console Cable Connection

    If you connect or disconnect the console cable with power applied to the Warning switch or any device on the network, an electrical arc can occur. This could cause an explosion in hazardous location installations. Be sure that power is removed or the area is nonhazardous before proceeding.
  • Page 237: Console Cable Connection

    Aviso Se você conectar ou desconectar o cabo do console com a alimentação sendo fornecida ao switch ou a qualquer dispositivo da rede, poderá ocorrer um arco elétrico. Isso pode causar uma explosão em instalações em áreas de risco. Antes de prosseguir, confirme se a alimentação foi removida ou se a área é...
  • Page 238 Console Cable Connection ¡Advertencia! Si conecta o desconecta el cable de la consola al switch o a cualquier dispositivo de la red mientras se suministra alimentación, se puede crear un arco eléctrico que podría provocar una explosión en una zona de instalaciones peligrosas.
  • Page 239: Overtemperature Warning

    Translated Safety Warnings Overtemperature Warning Overtemperature Warning To prevent the switch from overheating, do not operate it in an area that Warning exceeds the maximum recommended ambient temperature of 140°F (60°C). To prevent airflow restriction, allow at least 3 inches (7.6 cm) of clearance around the ventilation openings.
  • Page 240: Overtemperature Warning

    Aviso Para evitar o superaquecimento do switch, não o opere em áreas que excedam a temperatura ambiente máxima recomendada de 140°F (60°C). Para evitar a obstrução do fluxo de ar, deixe um espaço de pelo menos 3 polegadas (7,6 cm) junto às aberturas de ventilação.
  • Page 241: Class I, Division 2, Hazardous Location

    I, divisie 2, dient deze geïnstalleerd te worden in een daarvoor bestemde kast met de juiste bedradingsmethode voor alle stroom-, ingangs- en uitgangsbedrading, die voldoet aan de elektrische bouwverordeningen en in overeenstemming is met de instantie die gaat over installaties van klasse I, divisie 2. Catalyst 2955 Hardware Installation Guide C-29 78-14944-03...
  • Page 242 Classe I, Divisão 2. Catalyst 2955 Hardware Installation Guide C-30 78-14944-03...
  • Page 243 2, måste den monteras i ett lämpligt hölje med korrekt ledningsdragningsmetod för alla el-, ingångs- och utgångsledningar, som uppfyller gällande elföreskrifter och i enlighet med de krav som utfärdats av organ som har jurisdiktion över installationer som tillhör Klass I, Division 2. Catalyst 2955 Hardware Installation Guide C-31 78-14944-03...
  • Page 244: Twisted-Pair Supply Wires

    Utilice cables de suministro de par trenzados adecuados para temperaturas ¡Advertencia! superiores en 30°C (86°F) a la temperatura ambiente exterior del alojamiento. Varning! Använd partvinnade trådar som lämpar sig för 86 °F (30 °C) över omgivningstemperaturen utanför höljet. Catalyst 2955 Hardware Installation Guide C-32 78-14944-03...
  • Page 245: Pollution Degree 2 Industrial Environment

    Cet équipement doit être utilisé dans un environnement industriel de degré 2 de pollution, dans des applications de catégorie II de surtension (comme défini par le document 60664-1 de l'IEC) et à une altitude maximale de 2. 000 mètres sans déclassement. Catalyst 2955 Hardware Installation Guide C-33 78-14944-03...
  • Page 246 Denna utrustning är avsedd för användning i en industriell miljö, med nedsmutsningsgrad 2, i överspänningskategori II-tillämpningar (enligt definitionen i IEC publikation 60664-1), samt på upp till 2000 m höjd över havsnivån utan korrigering. Catalyst 2955 Hardware Installation Guide C-34 78-14944-03...
  • Page 247: Port Connection

    Do not connect or disconnect cables to the ports while power is applied to the switch or any device on the network because an electrical arc can occur. This could cause an explosion in hazardous location installations. Be sure that power is removed from the switch and cannot be accidentally be turned on, or verify that the area is nonhazardous before proceeding.
  • Page 248: Port Connection

    Isso pode causar uma explosão em instalações em áreas de risco. Certifique-se de que a alimentação do switch foi interrompida e de que não há possibilidade de ser acionada acidentalmente ou verifique se a área é...
  • Page 249 ¡Advertencia! No conecte ni desconecte los cables de los puertos mientras se suministra alimentación al switch o a cualquier dispositivo de la red. De lo contrario se puede crear un arco eléctrico que podría provocar una explosión en una zona de instalaciones peligrosas.
  • Page 250: Installation Instructions

    Warnung Vor dem Anschließen des Systems an die Stromquelle die Installationsanweisungen lesen. Avvertenza Consultare le istruzioni di installazione prima di collegare il sistema all'alimentatore. Advarsel Les installasjonsinstruksjonene før systemet kobles til strømkilden. Catalyst 2955 Hardware Installation Guide C-38 78-14944-03...
  • Page 251: Service Personnel Warning

    AS/NZS 3260 Clausule 1.2.14.3 Service Personnel. Varoitus Tämän laitteen saa asentaa tai huoltaa ainoastaan Australiassa ja Uudessa Seelannissa sovellettavan AS/NZS 3260 -standardin kohdan 1.2.14.3 Service Personnel määrittelemä huoltohenkilöstö. Catalyst 2955 Hardware Installation Guide C-39 78-14944-03...
  • Page 252: Service Personnel Warning

    Este equipo se debe instalar y mantener solamente por personal de servicio, según definido por AS/NZS 3260 Cláusula 1.2.14.3 Service Personnel. Varning! Installation och underhåll av denna utrustning får endast utföras av servicepersonal enligt definition i AS/NZS 3260 klausul 1.2.14.3 Service Personnel. Catalyst 2955 Hardware Installation Guide C-40 78-14944-03...
  • Page 253: Stacking The Chassis Warning

    Non collocare lo chassis su nessun altro apparecchio. Se lo chassis cade, può causare lesioni gravi e danni alle apparecchiature. Advarsel Stable ikke kabinettet oppå annet utstyr. Hvis kabinettet faller, kan det forårsake alvorlig skade på mennesker og utstyr. Catalyst 2955 Hardware Installation Guide C-41 78-14944-03...
  • Page 254: Ground Connection Warning

    When installing the unit, always make the ground connection first and Warning disconnect it last. Statement 42 Waarschuwing Bij de installatie van het toestel moet de aardverbinding altijd het eerste worden gemaakt en het laatste worden losgemaakt. Catalyst 2955 Hardware Installation Guide C-42 78-14944-03...
  • Page 255: Ground Connection Warning

    última a ser desligada. ¡Advertencia! Al instalar el equipo, conectar la tierra la primera y desconectarla la última. Varning! Vid installation av enheten måste jordledningen alltid anslutas först och kopplas bort sist. Catalyst 2955 Hardware Installation Guide C-43 78-14944-03...
  • Page 256: Selv-Iec 60950 Dc Power Supply

    (SELV) constantes dos padrões de segurança baseados no IEC 60950. ¡Advertencia! Conecte la unidad sólo en una fuente de energía DC que cumpla con los requisitos de voltaje extra bajo (SELV - safety extra-low voltage) en los estándares de seguridad IEC 60950. Catalyst 2955 Hardware Installation Guide C-44 78-14944-03...
  • Page 257: Jewelry Removal Warning

    (inclusief ringen, kettingen en horloges) verwijderen. Metalen voorwerpen worden warm wanneer ze met stroom en aarde zijn verbonden, en kunnen ernstige brandwonden veroorzaken of het metalen voorwerp aan de aansluitklemmen lassen. Catalyst 2955 Hardware Installation Guide C-45 78-14944-03...
  • Page 258: Jewelry Removal Warning

    (incluidos anillos, collares y relojes). Los objetos de metal se calientan cuando se conectan a la alimentación y a tierra, lo que puede ocasionar quemaduras graves o que los objetos metálicos queden soldados a los bornes. Catalyst 2955 Hardware Installation Guide C-46 78-14944-03...
  • Page 259: Product Disposal Warning

    Ultimate disposal of this product should be handled according to all national Warning laws and regulations. Statement 180 Waarschuwing Het uiteindelijke wegruimen van dit product dient te geschieden in overeenstemming met alle nationale wetten en reglementen. Catalyst 2955 Hardware Installation Guide C-47 78-14944-03...
  • Page 260 Deitar fora este produto em conformidade com todas as leis e regulamentos nacionais. ¡Advertencia! Al deshacerse por completo de este producto debe seguir todas las leyes y reglamentos nacionales. Varning! Vid deponering hanteras produkten enligt gällande lagar och bestämmelser. Catalyst 2955 Hardware Installation Guide C-48 78-14944-03...
  • Page 261: Class 1 Laser Product

    Produit laser de classe 1. Warnung Laserprodukt der Klasse 1. Avvertenza Prodotto laser di Classe 1. Advarsel Laserprodukt av klasse 1. Aviso Produto laser de classe 1. ¡Advertencia! Producto láser Clase I. Varning! Laserprodukt av klass 1. Catalyst 2955 Hardware Installation Guide C-49 78-14944-03...
  • Page 262: Class 1 Led Product

    Appendix C Translated Safety Warnings Class 1 LED Product Class 1 LED Product Class 1 LED product. Statement 1027 Warning Waarschuwing Klasse 1 LED-product Catalyst 2955 Hardware Installation Guide C-50 78-14944-03...
  • Page 263 Class 1 LED-Produktwarnung Avvertenza Avvertenza prodotto LED di Classe 1 Advarsel LED-produkt i klasse 1 Aviso Produto de classe 1 com LED ¡Advertencia! Aviso sobre producto LED de Clase 1 Varning! Lysdiodprodukt av klass 1 Catalyst 2955 Hardware Installation Guide C-51 78-14944-03...
  • Page 264: Laser Radiation

    Não olhe diretamente para os feixes ou com instrumentos ópticos. ¡Advertencia! Es posible que las fibras desconectadas emitan radiación láser invisible. No fije la vista en los rayos ni examine éstos con instrumentos ópticos. Catalyst 2955 Hardware Installation Guide C-52 78-14944-03...
  • Page 265: Laser Radiation

    Appendix C Translated Safety Warnings Laser Radiation Varning! Osynlig laserstrålning kan avges från frånkopplade fibrer eller kontaktdon. Rikta inte blicken in i strålar och titta aldrig direkt på dem med hjälp av optiska instrument. Catalyst 2955 Hardware Installation Guide C-53 78-14944-03...
  • Page 266: Laser Viewing Warning

    à une distance de moins de 100 mm peut être nocif pour les yeux. Pour les faisceaux collimatés, observer la sortie laser avec certains instruments optiques conçus pour être utilisés à distance peut être nocif pour les yeux. Catalyst 2955 Hardware Installation Guide C-54 78-14944-03...
  • Page 267: Laser Viewing Warning

    Vid divergerande utstrålning, kan dina ögon skadas om du betraktar lasern med vissa optiska instrument inom en distans på 100 mm. Vid parallell utstrålning kan dina ögon skadas om du betraktar laserstrålen med vissa optiska instrument. Catalyst 2955 Hardware Installation Guide C-55 78-14944-03...
  • Page 268: Laser Beam Exposure

    Attention Éviter toute exposition directe au faisceau. Warnung Schützen Sie sich vor direkter Laserbestrahlung. Avvertenza Evitare l'esposizione diretta al raggio laser. Unngå direkte eksponering til laserstrålen. Advarsel Aviso Evite exposição a raios laser. Catalyst 2955 Hardware Installation Guide C-56 78-14944-03...
  • Page 269 Appendix C Translated Safety Warnings Laser Beam Exposure ¡Advertencia! Evite la exposición directa al haz del láser. Varning! Utsätt dig inte för laserstrålning. Catalyst 2955 Hardware Installation Guide C-57 78-14944-03...
  • Page 270: Chassis Warning For Rack-Mounting And Servicing

    Jos laite asetetaan osaksi täytettyyn telineeseen, aloita kuormittaminen sen alaosasta kaikkein raskaimmalla esineellä ja siirry sitten sen yläosaan. • Jos telinettä varten on vakaimet, asenna ne ennen laitteen asettamista telineeseen tai sen huoltamista siinä. Catalyst 2955 Hardware Installation Guide C-58 Appendix C Translated Safety Warnings Statement 1006...
  • Page 271 • Se il supporto è dotato di dispositivi stabilizzanti, installare tali dispositivi prima di montare o di procedere alla manutenzione dell’unità nel supporto. 78-14944-03 Chassis Warning for Rack-Mounting and Servicing Catalyst 2955 Hardware Installation Guide C-59...
  • Page 272 • Si el bastidor dispone de dispositivos estabilizadores, instalar éstos antes de montar o proceder al mantenimiento del equipo instalado en el bastidor. Catalyst 2955 Hardware Installation Guide C-60 Appendix C Translated Safety Warnings...
  • Page 273 • Om ställningen är försedd med stabiliseringsdon skall dessa monteras fast innan enheten installeras eller underhålls på ställningen. • • • 78-14944-03 Chassis Warning for Rack-Mounting and Servicing Catalyst 2955 Hardware Installation Guide C-61...
  • Page 274 Appendix C Translated Safety Warnings Chassis Warning for Rack-Mounting and Servicing • • • • • • Catalyst 2955 Hardware Installation Guide C-62 78-14944-03...
  • Page 275 Appendix C Translated Safety Warnings Chassis Warning for Rack-Mounting and Servicing Catalyst 2955 Hardware Installation Guide C-63 78-14944-03...
  • Page 276 Chassis Warning for Rack-Mounting and Servicing • • • • • • Catalyst 2955 Hardware Installation Guide C-64 Appendix C Translated Safety Warnings 78-14944-03...
  • Page 277 Appendix C Translated Safety Warnings Chassis Warning for Rack-Mounting and Servicing • • • Catalyst 2955 Hardware Installation Guide C-65 78-14944-03...
  • Page 278: Grounded Equipment Warning

    This equipment is intended to be grounded. Ensure that the host is connected Warning to earth ground during normal use. Statement 39 Waarschuwing Deze apparatuur hoort geaard te worden Zorg dat de host-computer tijdens normaal gebruik met aarde is verbonden. Catalyst 2955 Hardware Installation Guide C-66 78-14944-03...
  • Page 279: Grounded Equipment Warning

    Este equipo debe conectarse a tierra. Asegurarse de que el equipo principal esté conectado a tierra durante el uso normal. Varning! Denna utrustning är avsedd att jordas. Se till att värdenheten är jordad vid normal användning. Catalyst 2955 Hardware Installation Guide C-67 78-14944-03...
  • Page 280: Qualified Personnel Warning

    ¡Atención! Estos equipos deben ser instalados y reemplazados exclusivamente por personal técnico adecuadamente preparado y capacitado. Varning Denna utrustning ska endast installeras och bytas ut av utbildad och kvalificerad personal. Catalyst 2955 Hardware Installation Guide C-68 78-14944-03...
  • Page 281: Restricted Area

    Warnung Diese Einheit ist zur Installation in Bereichen mit beschränktem Zutritt vorgesehen. Der Zutritt zu derartigen Bereichen ist nur mit einem Spezialwerkzeug, Schloss und Schlüssel oder einer sonstigen Sicherheitsvorkehrung möglich. Catalyst 2955 Hardware Installation Guide C-69 78-14944-03...
  • Page 282: Restricted Area

    Varning! Denna enhet är avsedd för installation i områden med begränsat tillträde. Ett område med begränsat tillträde kan endast tillträdas med hjälp av specialverktyg, lås och nyckel eller annan säkerhetsanordning. Catalyst 2955 Hardware Installation Guide C-70 78-14944-03...
  • Page 283 Appendix C Translated Safety Warnings Restricted Area Catalyst 2955 Hardware Installation Guide C-71 78-14944-03...
  • Page 284: Chassis Power Connection

    DC circuit. To ensure that all power is OFF, locate the circuit breaker on the panel board that services the DC circuit, switch the circuit breaker to the OFF position, and tape the switch handle of the circuit breaker in the OFF position. Statement 140...
  • Page 285 Para se assegurar que toda a corrente foi DESLIGADA, localize o disjuntor no painel que serve o circuito de corrente contínua e coloque-o na posição OFF (Desligado), segurando nessa posição a manivela do interruptor do disjuntor com fita isoladora. Catalyst 2955 Hardware Installation Guide C-73 78-14944-03...
  • Page 286 Innan du kopplar jord- eller elledningar till eller från chassit måste du kontrollera att strömförsörjningen till likströmskretsen är bruten. Kontrollera att all strömförsörjning är BRUTEN genom att slå AV det överspänningsskydd som skyddar likströmskretsen och tejpa fast överspänningsskyddets omkopplare i FRÅN-läget. Catalyst 2955 Hardware Installation Guide C-74 78-14944-03...
  • Page 287: Exposed Dc Power Wire Warning

    Certifique-se de que nenhuma secção exposta de um fio condutor da fonte de energia de entrada de DC se extende a partir da ficha da placa de terminais. Catalyst 2955 Hardware Installation Guide C-75 78-14944-03...
  • Page 288 Varning! En blottad trådledning från en likströmsförsörjningsenhet kan utgöra en ledare för skadliga elektricitetsnivåer. Se till att inte någon blottad ledningsdel från likströmsförsörjningsenheten sticker ut från stiftplinten. Catalyst 2955 Hardware Installation Guide C-76 78-14944-03...
  • Page 289: I N D E X

    2-8, 2-9 alarms and relays LEDs 2-16 altitude A-2, A-4 applying the switch protective liner autonegotiation 10/100/1000 ports 10/100 ports cables 10/100/1000 ports 10/100 ports 2-6 to 2-7 100BASE-FX ports Catalyst 2955 Hardware Installation Guide 3-10, 4-13 IN-1...
  • Page 290 2-6 to 2-7 Catalyst 2955C-12 switch illustrated LEDs illustrated 2-12 Catalyst 2955S-12 switch illustrated LEDs illustrated 2-12 Catalyst 2955 Hardware Installation Guide IN-2 Catalyst 2955 switch warning labels Catalyst 2955T-12 switch illustrated LEDs illustrated 2-11 cautions, defined chassis power connection warning...
  • Page 291 B-10 electrical noise, avoiding electromagnetic interface (EMI) agency approvals EMC regulatory statements ensure that the switch is grounded warning Catalyst 2955 Hardware Installation Guide 3-17 to 3-27, 4-21 to 4-30 3-2, 3-17, 4-2, 4-21 3-4, 3-18, 4-6 4-15 xxvi, 2-19...
  • Page 292 2-3 to 2-5 LEDs 2-10 to 2-16 power and relay connector functional ground lug warning 4-6, 4-18 Catalyst 2955 Hardware Installation Guide IN-4 ground connection warning grounded equipment warning grounding procedures 3-5, 3-20, 3-33, hazardous location installation warning hazardous location warnings...
  • Page 293 C-38 3-5, 4-7, B-4 management options mounting DIN rail rack MT-RJ connector Catalyst 2955 Hardware Installation Guide 3-6, 4-7, C-56 C-52 3-5, 4-7, C-54 2-16 2-16 2-10 to 2-16 2-13 2-13 2-14 to 2-15...
  • Page 294 A-2, A-5 pinouts 10/100/1000 ports 10/100 ports adapters B-11 DB-25 B-10 Catalyst 2955 Hardware Installation Guide IN-6 console port DB-25 adapter RJ-45-to-DB-9 adapter cable crossover cable crossover cables four twisted-pair, 10/100 ports four twisted-pair, 1000BASE-T ports two twisted-pair...
  • Page 295 DIN rail or a Catalyst 2955 Hardware Installation Guide 3-5, 4-7, C-47 3-10, 4-13 xxvi C-68 3-57 to 3-58, 4-42 to 4-43 3-9, 4-11...
  • Page 296 10/100 ports four twisted-pair, 1000BASE-T ports two twisted-pair SunNet Manager 2-20 supply wires warning 3-3, 3-32, 3-42, 4-4, C-32 to C-33 Catalyst 2955 Hardware Installation Guide IN-8 switch, power-on switch relays warning technical specifications Telnet, and accessing the CLI temperature operating...
  • Page 297 1-4, stacking the chassis supply wires temperature translated wiring the relays 2-9, 4-3, 4-28 Catalyst 2955 Hardware Installation Guide 2-16, 4-4, 4-33 3-3, 4-4 3-2 to 3-6, 4-2 to 4-7, C-3 C-38 3-5, 4-7, B-4 3-4, 4-6, C-45 3-6, 4-7, C-56...
  • Page 298 Index Catalyst 2955 Hardware Installation Guide IN-10 78-14944-03...

Table of Contents

Save PDF