FDT2108D-288&576
Quick Installation Guide
Issue
02
Date
2021-06-15
HUAWEI TECHNOLOGIES CO., LTD.

Advertisement

Table of Contents
loading

Summary of Contents for Huawei FDT2108D-288

  • Page 1 FDT2108D-288&576 Quick Installation Guide Issue Date 2021-06-15 HUAWEI TECHNOLOGIES CO., LTD.
  • Page 2 Notice The purchased products, services and features are stipulated by the contract made between Huawei and the customer. All or part of the products, services and features described in this document may not be within the purchase scope or the usage scope. Unless otherwise specified in the contract, all statements, information, and recommendations in this document are provided "AS IS"...
  • Page 3: Preface

    Huawei is not liable for any consequence that results from customers' violation of universal operation requirements or equipment design, manufacturing, and usage safety standards.
  • Page 4 When working at heights, take proper measures to prevent objects from falling down. Change History Issue Date Description 2020-09-28 This issue is the first official release. 2021-06-15 Added FDT2108-288 product information and FDT base installation. Issue 02 (2021-06-15) Copyright © Huawei Technologies Co., Ltd.
  • Page 5: Table Of Contents

    6.1 Splicing Optical Fibers in the Integrated Splicing and Termination Tray ..............16 6.2 Splicing Optical Fibers in the Straight Splicing Subrack .................... 17 7 Sealing the Cabinet ........................19 8 Post-installation Check ......................20 Issue 02 (2021-06-15) Copyright © Huawei Technologies Co., Ltd.
  • Page 6: Installation Preparation

    FDT2108D-288&576 Quick Installation Guide 1 Installation Preparation Installation Preparation 1.1 Appearance and Structure FDT2108D-288 FDT2108D-576 Issue 02 (2021-06-15) Copyright © Huawei Technologies Co., Ltd.
  • Page 7: Routing

    FDT2108D-288&576 Quick Installation Guide 1 Installation Preparation The appearance and structure for FDT2108D-288 is similar to FDT2108D-576. This uses FDT2108D-576 as an example. 1.2 Routing 1.3 Tools Common Tools Marker 3-m measuring tape Scissors Drill bit (Φ16 mm) Flat-head screwdriver...
  • Page 8 1 Installation Preparation (M3, M6) (M3, M6) Hammer drill Rubber hammer Claw hammer Fiber splicing tools Cable/Wire stripper Kevlar scissors Socket wrenches (M10 and Diagonal pliers Combination pliers M12) Adjustable wrench Protective gloves Issue 02 (2021-06-15) Copyright © Huawei Technologies Co., Ltd.
  • Page 9: Installation Process

    1. Put away materials that are not used during the installation for future use. 2. Put away components that are removed during the installation and protect them against contamination. 3. Clean the required parts or components before the installation. Issue 02 (2021-06-15) Copyright © Huawei Technologies Co., Ltd.
  • Page 10: Installing The Cabinet

    FDT2108D-288 and FDT2108D-576 can be installed only on the ground. Building a Concrete Base The FDT2108D-288 and FDT2108D-576 can be installed on the ground in the same way except that they differ in the dimensions of the cabinet bases and the concrete bases. Specific dimensional differences will be described in the following.
  • Page 11 Step 3 a) Plan the dimensions of the concrete base, and build the base. b) Determine the installation positions using the marking-off template, drill Φ16 mm holes at the planned positions using a hammer drill, and install expansion bolts. Issue 02 (2021-06-15) Copyright © Huawei Technologies Co., Ltd.
  • Page 12 Concrete base dimensions 2 (unit: mm) Model FDT2108D-288 FDT2108D-576  This product supports two types of concrete base sizes. For details, see "Concrete base dimensions 1" and "Concrete base dimensions 2". Issue 02 (2021-06-15) Copyright © Huawei Technologies Co., Ltd.
  • Page 13 For the FDT2108D-576, the bottom panels of both the front and back cabinet bodies need to be removed. Step 2 Remove the side panels of the cabinet base. (For the FDT2108D-576, skip this step.) Issue 02 (2021-06-15) Copyright © Huawei Technologies Co., Ltd.
  • Page 14 Step 4 Remove the hoisting ears, and install the dustproof blocks back on the top of the cabinet. Step 5 Install the bottom panel back. To install the bottom panel back, perform the installation in reverse of the removal procedure. ----End Issue 02 (2021-06-15) Copyright © Huawei Technologies Co., Ltd.
  • Page 15: Installing The Compact Optical Splitter

    Step 1 Insert the compact optical splitter into the subrack, and secure the captive screws on the panel. Step 2 Route the pigtails of the optical splitter along the fiber routing unit on the right. Step 3 Secure the unused pigtails at the parking unit. ----End Issue 02 (2021-06-15) Copyright © Huawei Technologies Co., Ltd.
  • Page 16: Typical Configuration And Cable Routing

    Quick Installation Guide 4 Typical Configuration and Cable Routing Typical Configuration and Cable Routing The FDT2108D-288 and FDT2108D-576 can be used in the scenario: Integrated splicing and termination+optical splitting+straight-through fiber splicing. FDT2108D-576 is used as an example. Integrated Splicing and Termination+Optical Splitting+Straight-through Fiber Splicing 1.
  • Page 17: Grounding, Leading In, Stripping, And Securing Optical Cables

    Punch a hole in the ground cable aperture and lead the ground cable on the cabinet and that on the optical cable entry unit out from the left aperture. The customer is responsible for leading the ground cable out to the protection ground. Issue 02 (2021-06-15) Copyright © Huawei Technologies Co., Ltd.
  • Page 18: Leading In Optical Cables

    This document uses default configuration of the optical cable entry unit as an example. Actual configuration should be performed based on the delivered unit. Step 3 Remove the baffle plate and lead in optical cables. ----End Issue 02 (2021-06-15) Copyright © Huawei Technologies Co., Ltd.
  • Page 19: Coiling Straight-Through Cables

    Securing Bundle Optical Cables Using Hose Clamps Step 1 Lead the optical cable through the hose clamp, insert the strength member into the hole on the fixing post, and secure the strength member and hose clamp. Issue 02 (2021-06-15) Copyright © Huawei Technologies Co., Ltd.
  • Page 20 Step 2 Lead the optical cable into the integrated splicing and termination module from the right side of the optical cable entry unit, and bind the optical cable at a proper position as required. ----End Issue 02 (2021-06-15) Copyright © Huawei Technologies Co., Ltd.
  • Page 21: Splicing And Terminating Optical Fibers

    Step 2 Open the cover of the of the integrated splicing and termination tray, lead in the optical fibers covered with fiber protection tubes from the right of the integrated splicing and termination tray, and reserve optical fibers of a certain length by coiling them in the coiling area. Issue 02 (2021-06-15) Copyright © Huawei Technologies Co., Ltd.
  • Page 22: Splicing Optical Fibers In The Straight Splicing Subrack

    Step 3 Strip the optical fibers until fiber cores are seen, clean the fiber cores, splice two optical fibers of the same color together until all the optical fibers are spliced, and heat shrink the fiber cores. Issue 02 (2021-06-15) Copyright © Huawei Technologies Co., Ltd.
  • Page 23 After the fiber splice protectors are secured, ensure that the bare fibers at both ends are loosely arranged to avoid fiber damage. Step 5 Close the cover of the straight splicing tray, and insert the straight splicing tray back into the subrack. ----End Issue 02 (2021-06-15) Copyright © Huawei Technologies Co., Ltd.
  • Page 24: Sealing The Cabinet

    Step 3 Fill sealing material (sealant) into the gap between the cable aperture and optical cables. Step 4 Fill sealing material (sealant) into the gap between the baffle plate and the bottom plate of the cabinet. ----End Issue 02 (2021-06-15) Copyright © Huawei Technologies Co., Ltd.
  • Page 25: Post-Installation Check

    Check whether cable labels are correctly filled in and securely attached, and whether labels are arranged in order and in the same direction to facilitate viewing. Optical fiber Check whether the fiber connecting points are clean. Issue 02 (2021-06-15) Copyright © Huawei Technologies Co., Ltd.
  • Page 26 Check whether the bends of optical fibers are moderate and natural. Ensure that no other cables lay above the routed optical fibers. Issue 02 (2021-06-15) Copyright © Huawei Technologies Co., Ltd.