Page 2
All other trademarks and trade names mentioned in this document are the property of their respective holders. Notice The purchased products, services and features are stipulated by the contract made between Huawei and the customer. All or part of the products, services and features described in this document may not be within the purchase scope or the usage scope.
Installation Guide About This Document About This Document Purpose This document describes the process of installing a DC blade RRU3262 (referred to as RRU in this document). Product Versions The following table lists the product versions related to this document.
RRU3262 Installation Guide Contents Contents About This Document........................ii 1 Changes in RRU3262 Installation Guide..................1 2 Installation Preparations......................3 2.1 Reference Documents..............................4 2.2 Tools and Instruments..............................4 2.3 Skills and Requirements for Onsite Personnel.......................6 3 Information About the Installation...................7 3.1 RRU Exterior..................................8 3.2 RRU Ports..................................8 3.3 RRU Indicators................................10...
Installation Guide 1 Changes in RRU3262 Installation Guide Changes in RRU3262 Installation Guide This section describes the changes in the RRU3262 Installation Guide. 01 (2014-11-20) This is the first official release. Compared with draft C (2014-11-10), this issue does not include any new information.
Page 10
RRU3262 Installation Guide 1 Changes in RRU3262 Installation Guide Topic Change Description 3.4 Installation Scenarios Optimized the description of restrictions. 8 Installing the RRU Optimized the description of the distance between the mounting kit and the ground. Compared with Draft A (2014-09-30), this issue does not include any new information and no information is deleted from this issue.
Before the installation, pay attention to the following items: The customer's technical engineers must be trained by Huawei and be familiar with the proper installation and operation methods. The number of onsite personnel depends on the engineering schedule and installation environment.
The total number does not tally with the Find out the cause and report any missing packing list articles to the local Huawei office. Step 2 Check the exterior of the packing case. Issue 01 (2014-11-20) Huawei Proprietary and Confidential...
Page 43
Sign the Packing List with the customer. those on the packing list Either shipment shortage, wrong shipment Report to the local Huawei office. or damaged articles. CAUTION l To protect the equipment and prevent damage to the equipment, you are advised to keep the...