Content Index 1. General Safety Instructions ..................3 1.1 SAFETY: General Safety ..................3 1.2 SAFETY: General Power Safety ................5 2. Exploded view diagram with list of items ..............6 3. Wiring connectivity diagram ..................7 4. Disassembly and Assembly Procedures ..............8 4.1 Disassembly SOP ....................
IMPORTANT NOTICE FOR USE IN HEALTHCARE ENVIRONMENTS: Dell products are not medical devices and are not listed under UL or IEC 60601 (or equivalent). As a result, they must not be used within 6 feet of a patient or in a manner that directly or indirectly contacts a patient 1.1 SAFETY: General Safety...
Page 4
When operating your equipment: Do not use your equipment in a wet environment, for example, near a bath tub, sink, or swimming pool or in a wet basement. Do not use AC powered equipment during an electrical storm. Battery powered devices may be used if all cables have been disconnected.
socket. If your equipment uses an AC adapter: Use only the Dell provided AC adapter approved for use with this device. Use of another AC adapter may cause a fire or explosion. NOTE: Refer to your system rating label for information on the proper adapter model ...
4. Disassembly and Assembly Procedures 4.1 Disassembly SOP Preparation before disassemble 1. Clean the room for disassemble 2. Identify the area for monitor 3. Check the position that the monitors be placed and the quantity of the monitor; prepare the area for material flow;...
Page 9
1. Remove CTRL BD FFC from I/F BD and remove all tapes from Main SHD 3. Remove JACK BD FFC from LED Driver BD and remove all tapes from Panel 1. Remove all tapes from Panel (See Green mark) 2. Remove Backlight wire from SPS BD (See Red mark) 3.
Page 10
1. Remove LVDS FFC from I/F BD 2. Disassemble Mylar from Main SHD 1. Unlock 8 PCBA Philips-head screws screwdriver 2. Disassemble I/F BD (Torsion of from Main SHD screw: 8.0±1.0kg) 3. Remove SPS BD Wire from I/F BD and disassemble SPS BD from Main SHD - 10 -...
4.2 Assembly SOP Preparation before assemble 1. Clean the room for work 2. Identify the area for material 3. Prepare the implement, equipment, material as bellow: 1) Working table 2) Philips-head screwdriver 3) Glove 4) Cleaning cloth 5) ESD protection Item Picture Operation...
Page 12
Item Picture Operation Tool Notes 1. Place Main SHD on Middle Frame and Panel 2. Insert LVDS FFC into Panel 3. Arrange CTRL LENS BD FFC on Main SHD (See Green mark) 4. Insert CTRL LENS BD FFC and Sensor BD FFC to I/F BD 1.
Page 13
Item Picture Operation Tool Notes 1. Insert CTRL BD FFC Philips- to I/F BD and stick it head screw on Main SHD driver (Torsion of Key screw 8~10Kg) 2. Insert JACK BD FFC into LED Driver BD and stick it on Panel JACK BD FFC 3.