Port Fittings ......................7 Main Cabin Top Deck Components ............... 8 Safety is always a concern at Ranger Tugs. Please read all manuals to ensure that Stern Components ....................9 equipment is used in a safe manner. We highly recommend attendance in a Coast Main Cabin And Cockpit Lights ................
SYMBOL GLOSSARY SPECIFICATIONS R-29 S Attention! – Important Operating or Maintenance Instructions Length ..................28' 10" 8.79 m Length Overall (w/swim step) ............33' 4" 10.16 m Beam .................... 10' 0" 3.05 m Draft ..................... 28" .71 m Attention! –...
EQUIPMENT LOCATION PORT FIT TINGS STARBOARD FIT TINGS 1 2 3 4 5 6 7 8 9 10 11 12 13 Keep all vents, drains and exhausts clear of any obstructions to ensure proper performance of each system. Keep all vents, drains and exhausts clear of any obstructions to ensure proper performance of each system.
MAIN CABIN AND COCKPIT LIGHTS FUEL SYSTEM, ENGINE, GENERATOR & WEBASTO FURNACE Volvo D4 300hp There is a secondary on-engine fuel fi lter that is not shown on this drawing. You will be able to fi nd information about this fi lter in the diesel engine manual supplied with your boat. The sec- ondary fi lter is where the water-in-fuel sensor is located.
CLOSED ENGINE COOLING SYSTEM RAW WATER / SEA STRAINER SYSTEM Provides an alternate heating system for the Fresh Water Heater and provides primary heating • Engine raw water thru-hull and strainer source for the Forced Air Cabin Heater. This system is also designed to provide cooling to the •...
FRESH WATER PLUMBING SYSTEM SHOWER SUMP 60 Gallon Fresh Water Tank, 8 Gallon Hot Water Heater, 3.5 GPM Fresh Water Pump. 12V, 800 GPH (This should be inspected for debris on a regular basis if shower is used frequently.) The shower sump box is located underneath a removable panel in the stateroom fl oor positioned just outside the head door.
BILGE PUMP SYSTEM WASTE SYSTEM WITH MACERATOR PUMP 12V 1100GPH 40 Gallon Tank with standard pump out, and vent The bilge pumps operate automatically with electronic fl oat switches even with battery switches Macerator pump out and breakers in the OFF position. However, the BILGE PUMP and BILGE PUMP2 will run continuously once their switches are placed in the on position.
ELEC TRIC PUMPS ONBOARD AIR CONDITIONING A/C Vent Forward A/C Unit (Under Berth) Macerator (Under Berth) Shower Sump (Under floor panel just outside of Forward A/C head door) Air Intake Grill (keep uncovered) Front A/C Control Panel A/C Vent A/C Vent Main Cabin A/C Unit (Under Helm Seat) Main Cabin A/C...
WEBASTO FURNACE SOLAR PANEL Webasto furnace is located under access panel below refrigerator. Solar panel 160 watt, with display panel The control panel is located at the quarter berth power management center. The fuel pump is in the salon fl oor hatch compartment inside of the black box. •...
BAT TERY CONFIGURATION FUSE LOCATION & VALUES FUSE LOCATION & VALUES Dash Navigation Dash 1 Switch Panel (4 switch) Navigation 4 House Batteries, 1 Engine Battery, 1 Thruster Battery. These DC fuse blocks and windlass breaker are located behind a hinged access panel on the star- Switch Panel (8 switch) board side in the head behind the mirror.
FUSE LOCATION & VALUES POWER PANEL AND SOLAR PANEL CONTROLLER BOX Located in the port side cockpit lazerette These DC fuse blocks are located behind the wood hatch in the midberth. Fuses are automotive blade type and all values shown below are in Amps. Solar Panel Controller may be mounted forward of the power panel on boats with a generator Hot powered (always on) Bilge Pump #1...
AC DISTRIBUTION PANEL & ROTARY SWITCH 12V HELM CONTROL OPERATION ANCHOR/ CHART WIPER WIPER WIPER BILGE BILGE HORN LIGHTS PUMP PUMP AC Distribution Panel AC Rotary Selector Switch (Available with Generator) AC Main Line 2 (with AC) Armed = Red light/audible alarm Off = Red light only.
RANGER TUG R-29 WIRING SCHEMATIC (P.D.P.) RANGER TUG R-29 WORKING DECK R-29 Power Distribution ELECTRICAL SCHEMATIC To Generator Control Panel 6 RED 6 RED To Bridge Fuse Block To AC Panel HOUSE 2/O RED 6 RED 6 RED To Quarter Berth Fuse Block 150A SWITCH 1 RED...
MAST SET UP AND TAKEDOWN CARE AND MAINTENANCE MAST SET UP PROCEDURE The following checklists are examples and are not all inclusive and are provided only as a guide. Please customize to your personal needs. Consult your engine and trailer user manuals for ad- 1.
EXAMPLE OF A SPRING PRE-LAUNCH CHECKLIST EXAMPLE OF WINTER STORAGE CHECKLIST CLEANING GENERAL MAINTENANCE Remove debris from scuppers and scupper drains. Fill Fuel Tank and add a fuel stabilizer. £ £ £ Clean hull using a mild biodegradable detergent and then wax. £...
Page 21
All rights reserved. Reproduction or translation by any means in whole or in part is not permitted without written authorization from Ranger Tugs. The information contained herein is correct to the best of Ranger Tugs knowledge and the contents may change without notice and without incurring obligation.