Page 1
Sliding gate operator FA01137-EN BX series BX-10 EN English INSTALLATION MANUAL...
Page 3
General precautions for installers WARNING! Important safety instructions. Follow all of these instructions. Improper installation can cause serious bodily harm. Before continuing, also read the general precautions for users. This product must only be used for its specifi cally intended purpose. Any other use may be hazardous. Cames s.P.A. Is not liable for any damage caused by improper, wrongful and unreasonable use.
Description Operator This product is engineered and manufactured by CAME S.p.A. in compliance with current safety standards. The operator is made of a cast aluminium part inside of which operates the irreversible, electromechanical gearmotor and an ABS plastic lining which holds the electronic card and transformer...
For connections that require several, sequential loads, the sizes given on the table must be re-evaluated based on actual power draw and distances. When connecting products that are not specified in this manual, please follow the documentation provided with said products. Standard installation 1) BX-10 assembly 2) Rack 3) Reception Antenna 4) Flashing light...
Page 7
Securing the plate and installing the assembly The following applications are only examples, as the space for installing the ratiomotor and accessories varies according to obstructions. It is thus up to the system installer to select the most suitable solution. - Dig a pit to the side of the gate (see measurements from diagram).
Page 8
- To position the plate in relation to the rack please see the measurements on the diagram. Fill the form box with cement and wait for at least 24 hours for it to solidify. - Remove the form box, fi ll the pit around the cement block with soil. - Unbolt the nuts and washers from the bolts.
Page 9
- Remove the cover from the gearmotor by loosening the side bolts, perforate the cable shafts using a screwdriver or a pair of scissors and position the gearmotor atop the plate. Careful! The electric cables must pass through the cable shafts. - Lift the gearmotor from the securing plate by about 5 to 10mm by using the threaded steel-levelling feet to allow any later adjustments between the pinion and the rack.
Page 10
- Open and close the gate manually and register the pinion-to-rack distance using the threaded steel-levelling feet (for vertical adjusting) and the slotted holes (horizontal adjusting). This prevents the weight of the gate from bearing on the operator. Rack Rack Pinion Pinion Levelling feet...
Control board General description Use 230V A.C. to power the electronic card using the L-N terminals, at a max 50/60Hz frequency. Use 24V to power the command devices and accessories. Careful! The accessories cannot exceed 37W of overall power. All connections are protected by quick-fuses – see table. The input and output contact functions, the timing settings and users’...
Electrical connections Gearmotor, endstop and encoder Description of the standard electrical connections for left-hand installations 230V (A.C.) motor with encoder Black Orange White Orange Opening microswitch Closing microswitch Modifications to the electrical connections for right-hand installations White Invert the gearmotor (U-V) and (FA-FC) endstop phases. Power supply for accessories Cable lug with bolt and washer for connecting to earth.
Page 13
Warning devices Open-gate status light Movement fl ashing light (contact range: 24V – 3W max) (Contact range: 230V – 25W max) - Flashes - Signal that gate is open; turns off when during the gate’s opening and closing gate is closed. phases.
Page 14
Safety devices DIR photocells Confi gure either (N.C.) contacts CX or CY, input for safety devices such as photocells, that comply with EN 12978 standards. See CX or CY input functions in: - C1 «re-open during closing phase», When the gate leaf is closing, opening the contact triggers the inversion of the direction of movement until the gate leaf is fully open.
Page 15
Electrical connection to operate the photocells’ safety test (DIR) (DOC) At each open/close command, the card check the photocells’ effi ciency. Any problems with the photocells will cause the (PROG) Led to fl ash on the electronic card, which cancels any commands from the radio transmitter or push-button. Electrical connection to operate the photocells’...
Page 16
Programming Description of display commands The <> keys are for: - shifting from one menu item to another - increase or decrease values The ESC key is for: - exiting the menu - cancelling modifications The ENTER key is for: - entering the menu - confirming and memorising set values the <...>...
• • • > > < Slave > > Do you conf.? ENTER < No > <Delete all Usr> > WWW.CAME.IT < Starup Msg > > ENTER Do you conf.? > ZBX-10 < Yes > > <ADJUSTMENTS> ENTER >...
Page 18
< ON > < Autom.Clos. > ENTER > < OFF > > > < 2-7 Command > <Open Close> ENTER > <Op.-Stop-Cl.> > > < Preflash > < ON > ENTER > < OFF > > > <Maintained Act> < ON > ENTER >...
Main menu LANGUAGE FUNCTIONS TIMING ADJ. English Press ENTER for 1 second ADJUSTMENTS RADIO USRS INFO Language menu Select language: selects among the languages displayed. < LANGUAGE > LANGUAGE LANGUAGE LANGUAGE English < English > < Deutsch > < Francais > FUNCTIONS TIMING ADJ.
Page 20
Pre-flashing: after an opening or closing command, the fl ashing light, connected to W-E1, starts fl ashing before the gate begins its run (to set the time, see “Pre-fl ashing timing” from the Adjust Timings menu < LANGUAGE > English Preflash <...
Page 21
CY input: N.C. safety contact input, lets you pair up the following functions: C1 (re-opening during closing), C2 (re-closing during opening), C3 (partial stop), C4 (obstacle stall), or, deactivated < LANGUAGE > English Engli < CY Input > CY Input CY Input Disabled <...
Page 22
Safety test: Allows the card to check the efficiency of any safety devices (i.e. photocells) after every opening or closing command. < LANGUAGE > English Safety Test < Safety Test > FUNCTIONS < Disable > Disable TIMING ADJ. Safety Test <Enabled on CX>...
Time setting menu Automatic closing: to set the waiting time when gate is in the open position. Once this time is elapsed, the gate closes automatically. The waiting time can be set to between 0” and 120”. < LANGUAGE > English FUNCTIONS A.C.T.
Page 24
Users Radio Menu New user: to create a new user and assigned function (see detailed function on page 27). The user will be assigned a number (max. 250 users) with a function. < LANGUAGE > Related Func. < New User > English <...
Load memory: to load the data saved on the memory roll onto card < LANGUAGE > Reading English < Restore backup > ooooooo • • • FUNCTIONS TIMING ADJ. RADIO USRS ADJUSTMENTS INFO INFO Cancel all: to cancel all registered users. Confirm cancellation of all users with ENTER. <...
Page 26
Deceleration speed: to adjust the deceleration speed when opening and closing. < LANGUAGE > English Slow.Down Spd. <Slow.Down Spd.> FUNCTIONS • • • -ooooo+ < -ooooo+ > • • • TIMING ADJ. RADIO USRS Slow.Down Spd. ADJUSTMENTS < -ooooo+ > •...
Page 27
Use the ENTER key to shift the cursor forwards, ESC to shift it backwards and < > to select the letter or number. Confirm the text by pressing ENTER for a few seconds. < LANGUAGE > English < Startup Msg > - WWW.CAME.IT FUNCTIONS ZBX-10 TIMING ADJ. RADIO USRS...
Page 28
Decoding card Insert the AF radio card which command the operator and insert, modify or remove any users using the transmitter. Insert the memory roll to save and upload the registered users onto another card. TOUCH AF Card See instructions on packaging TWIN ATOMO...
Page 29
Modifying user (modifying the function) 1) From the Users Radio menu, select 2) Select the user number or name for “Modify User”. Press ENTER to confirm. which you wish to modify the assigned function and press ENTER to confirm. 4) ...once you have selected the function 3) Select the assigned function.
Net address The “NET address” function is set when connecting two paired operators. Connect the two cards using the (2-A-B) terminals and insert the RSE cards into both. On the “MASTER” card you have selected, make all of the required electrical connections and set the functions and adjustments (see specific paragraphs).
Maintenance Periodic maintenance Periodic maintenance to be carried out by the end-user is as follows: wipe clean the glass surface of the photocells; check that the safety devices work properly; remove any obstructions. We suggest checking the state of lubrication and tightness of the anchoring screws on the operator. -To check the efficiency of the safety devices, move an object in front of the photocells when gate is closing.
Periodic maintenance log for end-user (every 6 moths) Signature Date Notes Extra-ordinary maintenance The following table serves to note down any extraordinary maintenance, repairs or improvements performed by specialised firms. N.B.: Any extraordinary maintenance must be performed by specialised technicians. Extra-ordinary maintenance log Installer’s stamp Operator name...
Page 33
Installer’s stamp Operator name Date of job Technician’s signature Requester’s signature Job performed _______________________________________________________________________________________ __________________________________________________________________________________________________ Installer’s stamp Operator name Date of job Technician’s signature Requester’s signature Job performed _______________________________________________________________________________________ __________________________________________________________________________________________________ Installer’s stamp Operator name Date of job Technician’s signature Requester’s signature Job performed _______________________________________________________________________________________ __________________________________________________________________________________________________ Installer’s stamp...
☞ CAME S.p.A. implements an EN ISO 14001 certified and compliant Environmental Management System at its plants, to ensure environmental protection. Please continue our efforts to protect the environment, something that CAME considers to be one of the foundations in developing its business and market strategies, simply by observing brief recommendations as regards disposal: DISPOSAL OF PACKAGING Packaging components (cardboard, plastic etc.) can be disposed of together with normal household waste without any difficulty, by simply...
Page 36
The contents of this manual may change, at any time, and without notice. CAME S.p.A. Via Martiri Della Libertà, 15 31030 Dosson di Casier - Treviso - Italy tel. (+39) 0422 4940 - fax. (+39) 0422 4941...