hit counter script
Huawei eAN3810A Hardware Installation Manual
Huawei eAN3810A Hardware Installation Manual

Huawei eAN3810A Hardware Installation Manual

3810 series airnode
Hide thumbs Also See for eAN3810A:

Advertisement

Quick Links

eAN3810A
V100R001C00
Hardware Installation Guide
Issue
01
Date
2017-04-30
HUAWEI TECHNOLOGIES CO., LTD.

Advertisement

Table of Contents
loading

Summary of Contents for Huawei eAN3810A

  • Page 1 V100R001C00 Hardware Installation Guide Issue Date 2017-04-30 HUAWEI TECHNOLOGIES CO., LTD.
  • Page 2 Notice The purchased products, services and features are stipulated by the contract made between Huawei and the customer. All or part of the products, services and features described in this document may not be within the purchase scope or the usage scope. Unless otherwise specified in the contract, all statements, information, and recommendations in this document are provided "AS IS"...
  • Page 3: About This Chapter

    Unless otherwise stated, "eNodeB", "Pico", "eAN", and "AirNode" in this document refer to the 3810 series AirNode. The 3810 series AirNode is a base station that provides communications services in Huawei OneAir solution. The following table lists the product name and product version related to the 3810 series AirNode.
  • Page 4: Installation Preparations

    1.4 Installation Process This section describes the eAN3810A installation process. 1.5 Obtaining the ESN Before installing the eAN3810A, record its electronic serial number (ESN) for future use during commissioning. 1.6 (Optional) Installing a Micro SD Card This section describes how to install a micro SD card in the eAN3810A.
  • Page 5 Hardware Installation Guide 1 eAN3810A Hardware Installation Guide Hammer drill (a φ12 bit) ESD gloves Vacuum cleaner Phillips screwdriver (M3 Flat-head screwdriver Heat gun to M6) (M3 to M6) Rubber mallet COAX crimping tool Wire stripper Power cable crimping tool...
  • Page 6: Requirements For Installation Personnel

    This section describes the hardware information you should know before installing the eAN3810A. eAN3810A hardware includes eAN3810A main equipment, auxiliary devices, mounting kits, and cables. For details, see sections in eAN3810A Hardware Description, which are listed in Table 1-1. Table 1-1 Hardware information...
  • Page 7 Figure 1-1 Diameter of a pole for installing a eAN3810A  The diameter of a pole for installing a eAN3810A ranges from 48 mm (1.89 in.) to 114 mm (4.49 in.). The recommended diameter is 60 mm (2.36 in.). ...
  • Page 8 The wall for installing eAN3810A must meet the following requirements:  The wall can bear a load at least four times the weight of a eAN3810A.  The screws must be tightened with a torque of 30 N·m. This ensures the screws work properly and the wall remains intact without cracks in it.
  • Page 9 This section describes the recommended and minimum clearances for a eAN3810A. Clearance for a eAN3810A When the eAN3810A is installed on a wall or pole, the minimum clearance is required for easy cabling and operation and maintenance (O&M). Based on the engineering practice, the recommendation for the installation clearance is provided.
  • Page 10 Hardware Installation Guide 1 eAN3810A Hardware Installation Guide Figure 1-4 Clearances for installing a eAN3810A Installation Spacing Between eAN3810A Figure 1-5 lists the horizonta spacing between eAN3810A. Issue 01 (2017-04-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 11 Hardware Installation Guide 1 eAN3810A Hardware Installation Guide Figure 1-5 Clearances for installing a eAN3810A Figure 1-6 lists the vertical spacing between eAN3810A. Issue 01 (2017-04-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 12: Installation Environment Requirements

    Hardware Installation Guide 1 eAN3810A Hardware Installation Guide Figure 1-6 Clearances for installing a eAN3810A 1.2.4 Installation Environment Requirements The installation environment of a eAN3810A involves the running environment specifications for the eAN3810A. Running Environment Specifications Table 1-2 shows the environment specifications for the eAN3810A.
  • Page 13 Requirements for the Installation methods To ensure the heat dissipation of the eAN3810A and waterproofing of the ports at the bottom of the eAN3810A, the vertical deviation angle of a eAN3810A must be less than or equal to 10°, as shown in Figure 1-8.
  • Page 14: Unpacking The Equipment

    Wear clean gloves, and avoid touching the equipment, components, or parts with bare hands, sweat-soaked gloves, or dirty gloves. Power on an eAN3810A within 24 hours after unpacking it. If you power off an eAN3810A for maintenance, restore power to the eAN3810A within 24 hours.
  • Page 15: Installation Process

    To help find out the cause of any damage in the future, take photos of the storeroom, rusted or eroded equipment, packing cases, and packing materials, and then file the photos. ----End 1.4 Installation Process This section describes the eAN3810A installation process. Figure 1-9 shows the eAN3810A installation process. Issue 01 (2017-04-30) Huawei Proprietary and Confidential Copyright ©...
  • Page 16 Context The ESN uniquely identifies a device and is required during commissioning. Procedure Step 1 Remove the backup ESN label from the surface of the eAN3810A. as shown in Figure 1-10. Before removing the backup SN label, photograph it.
  • Page 17 ----End 1.6 (Optional) Installing a Micro SD Card This section describes how to install a micro SD card in the eAN3810A. Prerequisites Software and configuration data files need to be prepared for the micro SD card to be installed.
  • Page 18 This section describes the procedure and precautions for installing an eAN3810A on a pole. Context  Do not stand an eAN3810A upright because the RF ports cannot support the weight of the eAN3810A.  Place a foam pad or cardboard under an eAN3810A to protect the eAN3810A housing from damage during the installation.
  • Page 19 1-13. Figure 1-13 Installing the eAN3810A mounting kit Determine a position for installing the eAN3810A. Then, place the separate mounting kit onto the pole, thread the hose clamp through the mounting kit, and encircle the pole with the hose clamp, as shown by illustrations a, b, and c in Figure 1-13.
  • Page 20 Figure 1-14 Securing the eAN3810A onto the mounting kit Hang the two dowels on the top of the eAN3810A attachment plate onto the mounting kit, and push the eAN3810A until it snaps into place, as shown by illustrations a and b in Figure 1-14.
  • Page 21 Procedure Step 1 Determine a position for installing the eAN3810A on a wall, use a level to verify that the marking-off template is placed horizontally, and then use a marker to mark anchor points, as...
  • Page 22 Hardware Installation Guide 1 eAN3810A Hardware Installation Guide Figure 1-16 Drilling a hole and inserting an expansion bolt assembly (1) M6x60 bolt (2) Nut (3) Spring washer (4) Flat washer (5) Expansion tube Use a hammer drill with a φ8 bit to drill holes vertically at the marked anchor points.
  • Page 23 (2) Spring washer (3) Flat washer Step 4 Hold the eAN3810A, hang the two dowels on the top of the eAN3810A attachment plate onto the separate mounting kit, and push the eAN3810A until it snaps into place, as shown by...
  • Page 24 Hardware Installation Guide 1 eAN3810A Hardware Installation Guide Figure 1-18 Securing the eAN3810A onto the mounting kit ----End 1.8 Installing the Auxiliary Devices This section describes the procedure and precautions for installing the auxiliary devices. 1.8.1 (Optional) Installing a Dock This section describes the procedure and precautions for installing a dock.
  • Page 25 Hardware Installation Guide 1 eAN3810A Hardware Installation Guide Figure 1-19 Replacing the Dock mounting bracket Step 2 Route two hose clamps through the up and down mounting holes on the Dock separate mounting bracket, but do not route the steel belts through the locks, as shown in Figure 1-20.
  • Page 26 Hardware Installation Guide 1 eAN3810A Hardware Installation Guide Figure 1-20 Routing hose clamps through the Dock separate mounting bracket Step 3 Put the Dock in the installation position, route two hose clamps through the pole and the steel belts through the locking connectors, partially tighten the screws, and use an M6 inner hexagon torque screwdriver to tighten the screws to 5 N·m (44.25 lbf·in.), as shown in...
  • Page 27 Hardware Installation Guide 1 eAN3810A Hardware Installation Guide Figure 1-21 Tightening hose clamps ----End Installing a Dock on a Wall This section describes the procedure and precautions for installing the Dock on a wall. Procedure Step 1 Place the Dock separate mounting bracket against the wall, use a level to verify that the...
  • Page 28 Hardware Installation Guide 1 eAN3810A Hardware Installation Guide Figure 1-22 Marking anchor points (1) Level (2) Mounting hole (3) Marker (4) Dock separate mounting bracket Step 2 Drill holes at the anchor points, and install expansion bolt assemblies, as shown in Figure 1-23.
  • Page 29 Hardware Installation Guide 1 eAN3810A Hardware Installation Guide Use a hammer drill with a Ф8 drill bit to drill holes perpendicularly with the wall at the marked anchor points. Ensure that the depth of each hole ranges from 45 mm to 50 mm (1.77 in.
  • Page 30 Hardware Installation Guide 1 eAN3810A Hardware Installation Guide Figure 1-25 Fitting the Dock onto the wall (1) Bolt (2) Flat washer (3) Spring washer (4) Nut ----End 1.8.2 (Optional) Installing the PSE This section describes the procedure and precautions for installing the PSE on a wall.
  • Page 31 Hardware Installation Guide 1 eAN3810A Hardware Installation Guide Figure 1-26 Marking anchor points Step 2 Drill holes and install expansion bolts. Figure 1-27 Drill holes and install expansion bolts Step 3 Install the PSE Issue 01 (2017-04-30) Huawei Proprietary and Confidential...
  • Page 32: Installing Cables

    1 eAN3810A Hardware Installation Guide Figure 1-28 Install the PSE ----End 1.9 Installing Cables This section describes the procedures for installing eAN3810A cables and auxiliary devices cables. 1.9.1 Cabling Requirements Cables must be laid out according to the specified cabling requirements to prevent signal interference.
  • Page 33 Hardware Installation Guide 1 eAN3810A Hardware Installation Guide  Cables must be bound tightly and neatly. The sheaths of cables must not be damaged.  Cable ties must face the same direction, and those at the same horizontal line must be in a straight line.
  • Page 34: Cable Connections

    1.9.2 Cable Connections This section describes eAN3810A cable connections. Figure 1-29 shows the cable connections when an eAN3810A is installed. Figure 1-29 Cable connections when an eAN3810A is installed Issue 01 (2017-04-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 35: Installing A Pgnd Cable

    Connect one end of the PGND cable with an M6 OT terminal to the ground terminal at the eAN3810A bottom and the other end of the cable with an M8 OT terminal to the external ground bar, as shown in Figure 1-30.
  • Page 36 Step 1 Remove the dustproof cap from the ANT port to be used on the eAN3810A. Step 2 Connect the type N male connector at one end of the eAN3810A RF jumper to the ANT port at the bottom of the eAN3810A in sequence, and use a torque wrench to tighten the connector to 1 N·m (8.85 lbf·in.), as shown in Figure1.
  • Page 37 1 eAN3810A Hardware Installation Guide Figure 1-32 Installing an RF jumper Step 3 Connect the other end of the eAN3810A RF jumper to the external antenna system. Step 4 Waterproof the connector of the RF jumper by Waterproof tape, as shown in Figure2.
  • Page 38 Hardware Installation Guide 1 eAN3810A Hardware Installation Guide  During installation, ensure that no foreign substance, including sand, enters the waterproof tape. Wrap a PVC insulation tape around the exposed area of the connector. The wrapped area is 15 mm away from the end of the connector, with a total length of 40 mm.
  • Page 39: Follow-Up Procedure

    Step 2 Connect the RJ45 connector at one end of the Ethernet cable to the PoE port on the eAN3810A panel, and push the cables into the cable clips, as shown in Figure 1-35.
  • Page 40 Hardware Installation Guide 1 eAN3810A Hardware Installation Guide Figure 1-35 Installing an eAN3810A Ethernet cable (1) PoE port on the eAN3810A panel (2) Ethernet cable Step 3 Connect the RJ45 connector at the other end of the Ethernet cable to auxiliary devices port.
  • Page 41 PSE External transmission device cable (2m) The total length of cables connected between the eAN3810A, PSE, and external transmission device does not exceed 100 m. 1.9.7 (Optional) Installing the Dock Ethernet Cable This section describes procedure and precautions for installing a Dock Ethernet cable.
  • Page 42 Connect the other end of the Ethernet cable, which is connected to the PoE port on the eAN3810A, to the LAN0 port in the cabling cavity of the Dock. The eAN3810A must be connected to the LAN0 port on the Dock. Otherwise, you are not able to maintain the eAN3810A remotely.
  • Page 43 Hardware Installation Guide 1 eAN3810A Hardware Installation Guide power into the Dock. A Dock cascading power cable is used for power supply cascading between two Docks. Context Table 1-3 lists the specifications of the two power cables. Table 1-3 Power cable specifications...
  • Page 44 Hardware Installation Guide 1 eAN3810A Hardware Installation Guide Use a flat-head screwdriver to loosen the left ports on the L, N, and PE wiring posts inside the Dock. Connect one end of each cable to the corresponding port on the left side and tighten the wiring posts.
  • Page 45 Hardware Installation Guide 1 eAN3810A Hardware Installation Guide Figure 1-38 Installing power cables The protective cover of the power supply terminal is automatically secured. After the procedure is complete, tap the protective cover to restore it. ----End Issue 01 (2017-04-30) Huawei Proprietary and Confidential Copyright ©...
  • Page 46: Checking Hardware Installation

    Waterproof blocks are securely installed in vacant cable troughs of the eAN3810A cabling cavity, and the cover plate of the cabling cavity is securely installed. In addition, vacant RF ports are covered with dustproof caps and the caps are tightened.
  • Page 47 This section describes the procedure for performing a power-on check on the eAN3810A. eAN3810A Power-On Check Procedure After you unpack a eAN3810A, you must power on it within 24 hours. If you power off the eAN3810A for maintenance, you must restore power to it within 24 hours.
  • Page 48 During the eAN3810A startup, there is no need to observe the indicator status.  During a start, the eAN3810A reads and writes the flash and therefore the indicators blinking quickly may blink irregularly for 1-2 seconds, which does not affect services.
  • Page 49: Antenna Installation

    This section describes reference information during installation. 1.12.1 ESN Collection Template This section describes the eAN3810A ESN collection template. The ESN collection template is used to record the installation position, and ESN of the site at the initial installation stage to facilitate subsequent commissioning and maintenance.
  • Page 50 Hardware Installation Guide 1 eAN3810A Hardware Installation Guide Related Document Description Installation Guide system. Issue 01 (2017-04-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.

Table of Contents