hit counter script
Hitachi RPS-90AN Instruction Manual
Hide thumbs Also See for RPS-90AN:

Advertisement

Quick Links

Installation, Operation and Maintenance
INSTRUCTIONS MANUAL
HITACHI SPLIT-TYPE AIR CONDITIONERS
Models :
INVERTER DRIVEN
AIR-COOLED TYPE
IMPORTANT:
READ AND UNDERSTAND THIS
INSTRUCTION MANUAL BEFORE
USING THIS AIR CONDITIONER.
KEEP THIS MANUAL FOR FUTURE
REFERENCE.
Indoor Unit
Outdoor Unit
RPS-90AN
+
RAC-90JK
65MP3195

Advertisement

Table of Contents
loading

Summary of Contents for Hitachi RPS-90AN

  • Page 1 Models : Indoor Unit Outdoor Unit RPS-90AN RAC-90JK Installation, Operation and Maintenance INSTRUCTIONS MANUAL HITACHI SPLIT-TYPE AIR CONDITIONERS ─ ─ INVERTER DRIVEN ─ ─ AIR-COOLED TYPE IMPORTANT: READ AND UNDERSTAND THIS INSTRUCTION MANUAL BEFORE USING THIS AIR CONDITIONER. KEEP THIS MANUAL FOR FUTURE REFERENCE.
  • Page 2 : Useful information for this operation and/or maintenance. ● If you have any questions, contact your installer, dealer of HITACHI or our customer care. ● This manual gives you description and information on how to operate this air conditioning unit.
  • Page 3: Table Of Contents

    — CONTENTS — Item Page Operation Instruction ……………………………………………………………….. 1 PREPARATION Installation Location ……………………………………………………………….. 8 Installation Space …………………………………………………………………...8 Foundation …………………………………………………………………………..10 Unit Check …………………………………………………………………………..10 INSTALLATION Anti-tumbler for Indoor Unit ………………………………………………………11 Anti-tumbler for Outdoor Unit ………………………………………………………12 REFRIGERANT AND DRAINAGE PIPING Preparations ………………………………………………………………………..13 Refrigerant Piping ………………………………………………………………..14 Drainage Piping ………………………………………………………………..15 EVACUATION AND REFRIGERANT CHARGE Evacuation Procedure ………………………………………………………..16...
  • Page 4: Operation Instruction

    Operation Instructions Operation Instructions ◆ Name of Parts INDOOR UNIT Horizontal Louver Air Outlet Vertical Louver Front Cover Air Inlet Gas Refrigerant OUTDOOR UNIT Piping Liquid Refrigerant Air Inlet Piping Field and Control Wiring Power Supply Main Circuit Breaker Leakage Breaker Air Outlet - 1 -...
  • Page 5 Operation Instructions Operation Instructions Precautions on Usage ◆ Please use fuse/circuit breaker with Don’t insert any material into the air proper amperage. inlet and air outlet. It may cause accidents and may injure Never use metal or copper wire as a fuse to avoid fault or occurrence of fire hazard.
  • Page 6 Operation Instructions Operation Instructions Wired remote controller (RC-A01ET1) ◆ Parts inside the box (Please check) ● 1. Wired remote controller x1 (communication wire x1, length = 9m) 2. Accessory assembly (plug x2, screw x2, cable tie x2) ▲ CA ! UTION (For safety, please obey the following items) 1.
  • Page 7 2. Installation for screws. Please use the screws attached in the accessory assembly, fixed by opposite angle position. Name of each part HITACHI Main Function Introduction NOTE ! Always press once to turn the Remote Control LCD light ON.
  • Page 8 Operation Instructions Operation Instructions ∗ Function – To choose the available functions in the remote control. MENU / BACK • Press this button can choose detail functions. ∗ Function – To save settings in the remote control. MEMORY • Choose MEMORY function and there are 2 memory set that can be saved.
  • Page 9 Operation Instructions Operation Instructions ∗ Function – To set to high cool operation. POWERFUL • Pressing the powerful button once the LCD light turn ON. By pressing it second time will produce “BEEP” sound. ∗ Function – To remove the timer setting in the unit. SLEEP •...
  • Page 10 Operation Instructions Operation Instructions ◆ Troubleshooting Unit does not start: 1. Is the main power source switch to the unit ON? 2. Is the main fuse normal? Poor cooling operation: 1. Are there any obstacles which hamper sufficient air to the indoor unit and outdoor unit coil? 2.
  • Page 11: Preparation

    Preparation Preparation 1. Preparation 1.1 Installation Location (1) Required Material – Measure, Architectural Information Regarding Installation Location. (2) Confirm that the final installation location is provided with convenient piping and wiring work. (3) Check the total piping length and difference in height between indoor and outdoor unit, it should not exceed the following: Maximum Piping Length Difference in Height...
  • Page 12 Preparation Preparation ◆ Operation Space for Outdoor Unit Individual Outdoor Unit (2) In case of existence of (3) In case of existence of (1) In case of existence of obstruction in the back obstruction on the front obstruction on top and and by the side (open (open space in the back, in the back (open...
  • Page 13: Foundation

    Preparation Preparation 1.3 Foundation (1) Check to ensure that the foundation is flat leveled and sufficiently strong. (2) Confirm elevation provision for the outdoor unit on a solid base with an iron frame or concrete curbs. Unit Leveled Installation (3) In order to obtain proper clearance beneath the either rooftop or on-the-ground installation, provide a gravel or concrete space around the outdoor unit air intake.
  • Page 14: Installation

    Installation I nstallation 2. Installation 2.1 Anti-tumbler for Indoor Unit (1) Be sure to secure the air conditioner with the anti-tumbler angle iron. (2) To keep the air conditioner from tumbling, fix it on the floor and the wall. Securing of the wall fixation angle iron ‧...
  • Page 15: Anti-Tumbler For Outdoor Unit

    Installation Installation 2.2 Anti-tumbler for Outdoor Unit (1) Use fix bolts as shown in the figure right to secure the unit on the base. (2) Apply enhanced installation to keep off seismic movements and typhoons. (3) Use cement base. Refer to figure below. Remark: The securing bolts are measured from 15mm in the base.
  • Page 16: Refrigerant And Drainage Piping

    Indoor Unit Outdoor Unit Liquid Line Gas Line Outer Diameter Size : Ø 6.35mm Size : Ø 15.88mm RPS-90AN RAC-90JK Type : 1/4 Flare Nut Type : 5/8 Flare Ø 20mm From (11~30m) Quantity Quantity : (4) Confirm that the indoor unit piping direction and accessories is suitable.
  • Page 17: Refrigerant Piping

    Refrigerant and Drainage Piping Refrigerant and Drainage Piping 3.2 Refrigerant Piping (1) Check to ensure that the stop valves of outdoor unit have been closed. (2) Attach the connection pipes to the stop valves. (3) Remove the air inlet grill, filter, filter guide and lower front cover. (4) Connect the indoor and the outdoor unit with the specified refrigerant pipes.
  • Page 18: Drainage Piping

    Refrigerant and Drainage Piping Refrigerant and Drainage Piping A. Outdoor Unit Below B. Outdoor Unit Above Field Piping Arrangement (Maximum piping length = 30m) 3.3 Drainage piping (1) The indoor drainage and the outdoor drainage shall be joined with adherent agents. (2) For assurance of normal drainage tubing operation, a water filler shall be given for a gradual adding of 1000cc of water from the right side of the air outlet to the evaporator while checking for leakage in the drainage.
  • Page 19: Evacuation And Refrigerant Charge

    Evacuation and Refrigerant Charge Evacuation and Refrigerant Charge 4. Evacuation and Refrigerant Charge Tools and Instruments Vacuum Pump, High Pressure Compound Gauge, Low Pressure Compound Gauge, Refrigerant Cylinder with Sufficient R410A Refrigerant, Weighing Scale, Charging Hoses (Lead Pipes), Other General Piping Tools and Ratchet Wrenches.
  • Page 20: Electrical Wiring

    Electrical Data Table Model Unit Main Power Starting Current Running Current Indoor Unit RPS-90AN 1 PHASE , 230V/60Hz 11.9A Outdoor Unit RAC-90JK 1 PHASE , 230V/60Hz 5.2 Main Power Wiring Procedures (1) If the phase is wrong, exchange two of the three wires connected from the main power source to the main terminals of the unit as indicated with the dotted lines, and then check the rotation direction of the phase sequence indicator once again.
  • Page 21: Main Power Wiring Specification

    Electrical Wiring Electrical Wiring 5.3 Main Power Wiring Specification Model RPS-90AN + RAC-90JK Nominal Cross-sectional Area Power Wire 5.5 mm (Or above UL 1015 AWG # 10) Connecting Wire 1.25 mm 5.4 Control Wiring Connect the control wires between the indoor unit terminals and the outdoor unit terminals according to the following to the wiring label.
  • Page 22: Test Running

    Test Running Test Running 6. Test Running 6.1 Final Installation Check Inspect the installation work according to all documents and drawings. Installation Work Check List shows the minimum check points. Installation Work Check List INSTALLATION WORK CHECK LIST 1. Is the unit solidly mounted and leveled? 2.
  • Page 23: Safety And Control Device Setting

    Test Running Test Running 6.4 Safety and Control Device Setting RPS-90AN Model RAC-90JK For Compressor Auto Reset,Non-adjustable High Pressure Switch kg/cm Cut-out 4150 Cut-In kg/cm 3200 Discharge Gas Thermostat Cut-Out Cut-In Internal Thermostat for Outdoor Fan Motor Cut-Out Cut-In Reverse Phase Protection Relay...
  • Page 24: Maintenance

    Maintenance Maintenance 7. Maintenance The unit should be periodically inspected according to the same items as those described in the paragraph entitled “Test Running”. In order to ensure dependable operation and long life, the following additional items should be given particular attention. 7.1 Components (Outdoor Unit) (1) Compressor –...
  • Page 25: Start-Up After Extended Shutdown

    (8) Tighten all wiring connections and access panels. 7.6 Replacement of Parts Replacement of parts should be performed by ordering from the HITACHI Parts List. The Form A HITACHI Recommended Spare Parts List is advisable. When replacement of parts becomes necessary, prepare the parts shown in the Form A Parts List.
  • Page 26 Maintenance Maintenance Test Running and Maintenance Record POWER SUPPLY : Main Power: ______ Phase, ________V, _____Hz Control :___________V Unit Compressor Model RPS - + RAC - Production No. CUSTOMER’S NAME :________________________________________ (PHONE NO._______________) CUSTOMER’S ADDRESS: _______________________________________________________________ INSTALLED BY:_________________________________ DATE:________________ START-UP BY:__________________________________ DATE:________________ 1.
  • Page 27 No. 1A Binictican Drive Subic Bay Industrial Park Phase ll Subic Bay Freeport Zone Philippines TEL: (02)362-4847 TEL(SERVICE): (02)362-3842 (RP-AF-H) Specifications in this manual are subject to change without prior notice, in order that HITACHI may bring the latest innovations to our customers.

This manual is also suitable for:

Rac-90jk

Table of Contents