hit counter script

Mounting; Installation Site; Carrier Rail Mounting; Figure 7: Mounting The Carrier Rail Mounting - WAGO 852-111 Mounting, Installation And Handling

5 port 100base-tx industrial eco switch
Hide thumbs Also See for 852-111:
Table of Contents

Advertisement

WAGO ETHERNET Accessories 852
852-111 5 Port 100BASE-TX Industrial ECO Switch
5

Mounting

5.1

Installation site

The location selected to install the industrial ECO switch may greatly affect its
performance. When selecting a site, we recommend considering the following
rules:
Install the industrial ECO switch at an appropriate place. See chapter
"Technical Data" for the acceptable temperature and humidity operating
ranges.
Fix the provided brackets at the back of the industrial ECO switch to a
carrier rail to protect the industrial ECO switch from falling.
Make sure that the heat output from the industrial ECO switch and ventilation
around it is adequate. Do not place any heavy objects on the industrial ECO
switch.
5.2

Carrier rail mounting

The carrier rail must optimally support the EMC measures integrated into the
system and the shielding of the internal data bus connections.
1.
Remove the screws on the back of the industrial Eco switch.
2.
Screw the carrier rail mounting to the back of the industrial Eco switch.

Figure 7: Mounting the carrier rail mounting

3.
Rest the industrial Eco switch on the carrier rail.
Parallel and perpendicular mounting is possible.
Manual
Version 1.1.0, valid from FW/HW Version 01/06
Mounting
27

Advertisement

Table of Contents
loading

Table of Contents